My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
89-100
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1989
>
89-100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2015 2:10:04 PM
Creation date
6/26/2003 10:46:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
89-100
Date
10/16/1989
Document Relationships
89-101
(Amended By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
059 <br /> <br />parking structure on the western portion of the Project Site <br />which will sit approximately 20 feet below the g~ound surface. <br />Structures 15 to 23 stories in height will be cantilevered over <br />a portion of the parking structure. Excavation and <br />re-compaction will be required. In addition, ground shaking <br />from earthquakes along the Newport-Inglewood or Whittier faults <br />may occur at the site. The Draft EIR recommends several <br />mitigation measures, including review of grading and <br />foundational plans by a registered soils engineer, performing <br />of all grading and earthwork under the observation of a <br />registered geotechnical engineer, notification of the soils <br />engineer if subsurface conditions do not conform to the <br />geotechnical investigation, performing any necessary site <br />preparation or foundation work to correct potential <br />differential expansion and expansive soils conditions, and <br />conducting a site-specific seismic design analysis to be <br />submitted to the City for the high-rise office structures. <br /> <br /> (2) Findinqs. Based upon the Final EIR and the <br />entire record before it, this City Council finds that: <br /> <br /> (i) The mitigation measures referenced <br />in the Final EIR have been adopted as Conditions of Approval or <br />incorporated into the Project. <br /> <br /> (ii) With the imposition or <br />incorporation of the recommended mitigation measures, the <br />impacts of the Project upon geology and soils will be reduced <br />to a level of insignificance. <br /> <br />13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.