Laserfiche WebLink
27O <br /> <br />c) <br /> <br />Furnish ornamental street lighting with underground service <br />as directed by the City Engineer. <br /> <br />d) <br /> <br />Construct 4 street tree wells and plant 4 m/nimum 24 inch <br />box trees per City Standard #1124 at location in accordance <br />with approved improvement plans. <br /> <br />e) <br /> <br />Remove 10' of existing block wall from 10' x 10' corner <br />cutoff at the intersection of Alley and Greenville Street <br />and improve per approved improvement plans. <br /> <br />f) <br /> <br />Remove 10' x 10' of existing block wall from lO'x 10' <br />corner cutoff at Northwest corner of subject property and <br />improve per approved improvement plans. <br /> <br />Complete the following on Sunflower Avenue: <br /> <br />a) <br /> <br />Remove existing drive approach and construct a new curb and <br />gutter per City Standard #1101 and per approved improvement <br />plans. <br /> <br />b) Install "No Stopping Anytime" zone. <br /> <br />c) <br /> <br />Furnish ornamental street lighting with underground service <br />a directed by the City Engineer. <br /> <br />d) <br /> <br />Construct 5 street tree wells and plant 5 mfn~m 24 inch <br />box trees per City Standard #1124 at location in accordance <br />with approved Improvement Plans. <br /> <br /> <br />