My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
90-088
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1990
>
90-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2014 9:11:50 AM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
90-88
Date
9/4/1990
Document Relationships
87-038
(Repeals)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1987
93-046
(Repealed By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
326 <br /> <br />RESOLUTION NO. 90-088 <br />PAGE 2 <br /> <br />(b) REFUNDS <br /> <br /> Upon written request from the permittee, <br />refunds of permit fees may be made to the permittee in an <br />amount equal to eighty percent (80%) of the permit fee in <br />excess of twenty dollars ($20.00) paid; except that no permit <br />fees shall be refunded under any of the following circumstances: <br /> <br />(1) After 180 days has elapsed from the date of the <br /> issuance of the permit. <br /> <br />(2) If any inspections have been performed by the <br /> Building Safety Department. <br /> <br /> If a permit has been issued for a project <br />located in an area outside of the jurisdiction of the city, one <br />hundred percent (100%) of the permit and plan check fee may be <br />refunded. If a duplicate permit has been erroneously issued, <br />one hundred percent (100%) of the duplicated permit and plan <br />check fee may be refunded. <br /> <br /> If a plan check fee has been paid and the plan <br />is withdrawn by the applicant prior to the plan check, refunds <br />of plan check fees may be made to the permittee in an amount <br />equal to eighty percent (80%) of the plan check fee in excess <br />of twenty dollars ($20.00) paid. In no other case may any plan <br />check fees be refunded. <br /> <br />(c) <br /> <br />SPECIAL INVESTIGATION FEE <br /> <br /> A special investigation fee shall be charged by <br />the Building Official for any investigation of a building, <br />structural work, reports, certification, or any other related <br />work requested by an owner or his authorized agent. Said fee <br />shall be assessed in an amount sufficient to reimburse the City <br />for the costs actually incurred by the City but in no case <br />shall be less than fifty dollars ($50.00). <br /> <br />(d) <br /> <br />VIOLATION INVESTIGATION FEE <br /> <br /> When any work for which a permit is required <br />has been commenced without the authorization of such permit, an <br />investigation may be required before a permit will be issued <br />for such work. An investigation fee of fifty dollars ($50.00) <br />shall be collected. In addition to the investigation fee and <br />regular permit fee, a penalty in an amount equal to the amount <br />of the total permit fee shall be required, but in no case less <br />than on hundred dollars (~100.00). <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.