My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
90-098
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1990
>
90-098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2015 1:46:21 PM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
90-98
Date
10/1/1990
Document Relationships
90-099
(Amended By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Finding 3: Specific economic, social, or other considerations make infeasible the mitigation <br /> measures or project alternatives identified in the E1R. <br /> <br />409 <br /> <br />Facts in Support of Finding <br /> <br />The effect could be eliminated or substantially lessened to a level less than significant by virtue <br />of the funding mechanisms and traffic-reducing mitigation measures identified in the Final EIR <br />and incorporated into the project. However, as two of the intersections (1-405 at Harbor, and 1- <br />405 at Fairview) are within the jurisdiction of another agency (the City of Costa Mesa), the impact <br />cannot be mitigated to a level less than significant under the authority of the City of Santa Ans. <br />In addition, while the intersection of Fail'view Street and MacArthur Boulevard are within the <br />jurisdiction of the City of Santa Ann, it is not feasible to expand this intersection without <br />disrupting land uses adjacent to this intersection (limited right-of-way). The funding measures <br />and traffic-reducing mitigation measures are as follows: <br /> <br />The project applicant shall pay the City of Santa Ana transportation system <br />improvement fees which contribute funding towards needed areawide <br />transportation improvements. <br /> <br />The project applicant shall provide plans for and install a bus stop shelter at the <br />existing bus stop location at Susan Street/Sunflower Avenue in accordance with <br />Orange County Transit District standards. Said plans shall be reviewed and <br />approved by the City of Santa Ann and OCTD prior to issuance of building <br />permits. <br /> <br />The project applicant shall implement the proposed Transportation Demand <br />Management (TDM) Plan for the new development proposed within the Lake <br />Center specific development area. The TDM Plan shall be administered by an <br />onsite coordinator who shall be the responsibility of the property owner. <br /> <br />Lighting plans prepared by the project applicant shall be revised and approved <br />by the City of Santa Aha prior to building permit issuance to ensure that <br />pedestrian access routes to the bus stop at Sunflower and Susan are adequately <br />illuminated. <br /> <br />Although these measures will lessen the impact of increased traffic, the effects remain <br />cumulatively significant because they do not improve traffic flow to the desired level of service at <br />every affected intersection, and because the City of Costa Mesa has responsibility over the <br />improvements of intersections within its jurisdiction. This impact is accel)table when weighed <br />against the facts set forth in the Statement of Overriding Considerations. <br /> <br />JB 1/08850001.SOF 21 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.