My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
90-098
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1990
>
90-098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2015 1:46:21 PM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
90-98
Date
10/1/1990
Document Relationships
90-099
(Amended By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
431 <br /> <br />The proposed project shall comply with city standards described in the General Plan <br />as they apply to buildings and parking structures located in a floodplain. <br /> <br />Timing of ImplementationNerification: <br /> <br />Method Or' Verification: <br /> <br />Responsible Parties: <br /> <br />Verification (Name & Date): <br /> <br />Prior to grading permit issuance <br /> <br />Written evidence provided by applicant <br /> <br />Sr. Plan Check Engineer, Building Division <br />& Engineering Services Manager, Design <br />Engineering Division <br /> <br />NOISE <br /> <br />10. <br /> <br />All construction activities shall be limited to the hours of 7:00 a.m. to 8:00 p.m., <br />Monday through Saturday. No construction shall be permitted on Sundays or federal <br /> <br />holidays. <br />Timing of Implementation/Verification: <br /> <br />Method of Verification: <br /> <br />Responsible Parties: <br /> <br />Verification (Name & Date's; <br /> <br />Prior to grading permit issuance <br /> <br />Grading plan check and field inspection <br /> <br />Environmental Coordinator, Planning <br />Division <br /> <br />11. <br /> <br />Where appropriate, construction equipment shall be muffled to reduce construction <br /> <br />noise impacts. <br />Timing of ImplementationNerification: <br /> <br />Method Q[ Verification: <br /> <br />Responsil~le Partie~3: <br /> <br />Verification (Name & Date): <br /> <br />Prior to grading permit issuance <br /> <br />Grading plan check, written verification <br />provided by applicant, and field inspection <br /> <br />Environmental Coordinator, Planning <br />Division <br /> <br />JB 1/0885PA101.A A-4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.