Laserfiche WebLink
431 <br /> <br />The proposed project shall comply with city standards described in the General Plan <br />as they apply to buildings and parking structures located in a floodplain. <br /> <br />Timing of ImplementationNerification: <br /> <br />Method Or' Verification: <br /> <br />Responsible Parties: <br /> <br />Verification (Name & Date): <br /> <br />Prior to grading permit issuance <br /> <br />Written evidence provided by applicant <br /> <br />Sr. Plan Check Engineer, Building Division <br />& Engineering Services Manager, Design <br />Engineering Division <br /> <br />NOISE <br /> <br />10. <br /> <br />All construction activities shall be limited to the hours of 7:00 a.m. to 8:00 p.m., <br />Monday through Saturday. No construction shall be permitted on Sundays or federal <br /> <br />holidays. <br />Timing of Implementation/Verification: <br /> <br />Method of Verification: <br /> <br />Responsible Parties: <br /> <br />Verification (Name & Date's; <br /> <br />Prior to grading permit issuance <br /> <br />Grading plan check and field inspection <br /> <br />Environmental Coordinator, Planning <br />Division <br /> <br />11. <br /> <br />Where appropriate, construction equipment shall be muffled to reduce construction <br /> <br />noise impacts. <br />Timing of ImplementationNerification: <br /> <br />Method Q[ Verification: <br /> <br />Responsil~le Partie~3: <br /> <br />Verification (Name & Date): <br /> <br />Prior to grading permit issuance <br /> <br />Grading plan check, written verification <br />provided by applicant, and field inspection <br /> <br />Environmental Coordinator, Planning <br />Division <br /> <br />JB 1/0885PA101.A A-4 <br /> <br /> <br />