Laserfiche WebLink
430 <br /> <br />All structures shall be designed by the applicant in accordance with the seismic design <br />provisions of the Uniform Building Codes to promote safety in the event of an <br />earthquake. <br /> <br />Timing of ImplementationNeriflcation: <br /> <br />Prior to approval of any grading permits <br />and implementation dur!ng grading phase <br /> <br />Method of Verification: <br /> <br />Grading plan check and periodic field <br />inspections <br /> <br />Responsible Par _ty: <br /> <br />Sr. Plan Check Engineer, Building Division <br /> <br />Verification (Name & Date): <br /> <br />WATER <br />7. <br /> <br />Prior to issuance of grading permits, onsite drainage improvement plans prepared by <br />the applicant shall be reviewed and approved by the City of Santa Ana Public Works <br />Department, and said onsite improvements shall be constructed by the project <br />applicant. <br /> <br />Timing of lmplementationNeriflcation: Prior to grading permit issuance <br /> <br />Method of Verification: <br /> <br />Grading plan check and field inspection <br /> <br />Responsible Parties: <br /> <br />Inspection Services Manager, Building <br />Division & Engineering Services Manager, <br />Design Engineering Division <br /> <br />Verification (Name & Date): <br /> <br />All development within the Santa Ann River floodplain shall be carefully reviewed by <br />the City of Santa Ann to ensure that it is located and designed to minimize potential <br />damage from flooding and to ensure that such development does not endanger other <br />areas. <br /> <br />Timing of Implementation/Verification: Prior to grading permit issuance <br /> <br />Method of Verificatior~: <br /> <br />Grading plan check and field inspection <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Check Engineer, Building Division <br />& Engineering Services Manager, Design <br />Engineering Division <br /> <br />Verification (Name & Date): <br /> <br />J B 1/08850(/01.A A-3 <br /> <br /> <br />