My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
90-098
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1990
>
90-098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2015 1:46:21 PM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
90-98
Date
10/1/1990
Document Relationships
90-099
(Amended By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
434 <br /> <br />TRAFFIC/CIRCULATION <br /> <br />18. <br /> <br />With the first building permit for the proposed proiect, the project applicant shall <br />construct a traffic signal at the intersection of Susan Street/Sunflower Avenue in <br />accordance with standard traffic signal warrants. Under the terms o~ a pending <br />reimbursement agreement between the cities of Santa Aha and Costa Mesa, the <br />project applicant shall install, and provide initial costs for, this traffic signal but shall <br />eventually b~ reimbursed for all but the "fair share" of the signal costs associated with <br />thc proposed Lake Center project. <br /> <br />Timing of lmplementationNerification: <br /> <br />Concurrent with first building permit <br />construction <br /> <br />Method of Verification: <br /> <br />Improvements plan check and field <br />inspection <br /> <br />Responsible Parties: <br /> <br />Engineering Services Manager, Design <br />Engineering Division <br /> <br />Verification (Name & Date): <br /> <br />19. <br /> <br />The project applicant shall install multiway (4-way) "stop" signage at the intersection <br />of Lake Center and Susan Street. <br /> <br />Timine of Implementation/Verification: Prior to first building permit issuance <br /> <br />Method of Verification: <br /> <br />Improvements plan check and field <br />inspection <br /> <br />Responsible Parties: <br /> <br />Engineering Services Manager, Design <br />Engineering Division <br /> <br />Verification (Name & Date]: <br /> <br />JB1/08850001.A A-7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.