Laserfiche WebLink
434 <br /> <br />TRAFFIC/CIRCULATION <br /> <br />18. <br /> <br />With the first building permit for the proposed proiect, the project applicant shall <br />construct a traffic signal at the intersection of Susan Street/Sunflower Avenue in <br />accordance with standard traffic signal warrants. Under the terms o~ a pending <br />reimbursement agreement between the cities of Santa Aha and Costa Mesa, the <br />project applicant shall install, and provide initial costs for, this traffic signal but shall <br />eventually b~ reimbursed for all but the "fair share" of the signal costs associated with <br />thc proposed Lake Center project. <br /> <br />Timing of lmplementationNerification: <br /> <br />Concurrent with first building permit <br />construction <br /> <br />Method of Verification: <br /> <br />Improvements plan check and field <br />inspection <br /> <br />Responsible Parties: <br /> <br />Engineering Services Manager, Design <br />Engineering Division <br /> <br />Verification (Name & Date): <br /> <br />19. <br /> <br />The project applicant shall install multiway (4-way) "stop" signage at the intersection <br />of Lake Center and Susan Street. <br /> <br />Timine of Implementation/Verification: Prior to first building permit issuance <br /> <br />Method of Verification: <br /> <br />Improvements plan check and field <br />inspection <br /> <br />Responsible Parties: <br /> <br />Engineering Services Manager, Design <br />Engineering Division <br /> <br />Verification (Name & Date]: <br /> <br />JB1/08850001.A A-7 <br /> <br /> <br />