Laserfiche WebLink
435 <br /> <br />20. <br /> <br />The project applicant shall post a faithful performance bond for the future installation <br />of a traffic signal at Lake Center and MacArthur Boulevard. This intersection shall <br />be monitored a~ the project is constructed for satisfaction of signal warrant <br />requirements and the signal shall be installed as warranted. <br /> <br />Timing of ImplementationNerification: Prior to grading permit issuance <br /> <br />Method of Verification: <br /> <br />Written evidence provided by applicant <br /> <br />l~g. sponsible Parties: <br /> <br />Engineering Services Manager, Design <br />Engineering Division <br /> <br />Verification (Name &Date): <br /> <br />21. <br /> <br />The project applicant shall pay the City of Santa Aaa transportation system <br />improvement fees which contribute funding towards needed areawide transportation <br />improvements. <br /> <br />Timing of ImplementationNerification: Prior to grading permit issuance <br /> <br />Melhod of Verificati0r~: <br /> <br />Written evidence provided by applicant & <br />City Manager's Office <br /> <br />Responsible Parties: <br /> <br />Engineering Services Manager, Design <br />Engineering Division <br /> <br />Verification (Name & Date): <br /> <br />22. <br /> <br />The project applicant shall provide plans for and install a bus stop shelter at the <br />existing bus stop location at Susan Street/Sunflower Avenue in accordance wilh Orange <br />County Transit District standards. Said plans shall be reviewed and approved by the <br />City of Santa Ana and O(.~I'D prior to issuance of building permits. <br /> <br />Ti.ming of lmplementationNerification: Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Written evidence provided by applicant & <br />OCTD <br /> <br />Re.spollsible Parties: <br /> <br />Engineering Services Manager, Design <br />Engineering Division <br /> <br />Verification (Name & Date): <br /> <br />J B 1/08850001.A A-8 <br /> <br /> <br />