My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
90-098
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1990
>
90-098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2015 1:46:21 PM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
90-98
Date
10/1/1990
Document Relationships
90-099
(Amended By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
435 <br /> <br />20. <br /> <br />The project applicant shall post a faithful performance bond for the future installation <br />of a traffic signal at Lake Center and MacArthur Boulevard. This intersection shall <br />be monitored a~ the project is constructed for satisfaction of signal warrant <br />requirements and the signal shall be installed as warranted. <br /> <br />Timing of ImplementationNerification: Prior to grading permit issuance <br /> <br />Method of Verification: <br /> <br />Written evidence provided by applicant <br /> <br />l~g. sponsible Parties: <br /> <br />Engineering Services Manager, Design <br />Engineering Division <br /> <br />Verification (Name &Date): <br /> <br />21. <br /> <br />The project applicant shall pay the City of Santa Aaa transportation system <br />improvement fees which contribute funding towards needed areawide transportation <br />improvements. <br /> <br />Timing of ImplementationNerification: Prior to grading permit issuance <br /> <br />Melhod of Verificati0r~: <br /> <br />Written evidence provided by applicant & <br />City Manager's Office <br /> <br />Responsible Parties: <br /> <br />Engineering Services Manager, Design <br />Engineering Division <br /> <br />Verification (Name & Date): <br /> <br />22. <br /> <br />The project applicant shall provide plans for and install a bus stop shelter at the <br />existing bus stop location at Susan Street/Sunflower Avenue in accordance wilh Orange <br />County Transit District standards. Said plans shall be reviewed and approved by the <br />City of Santa Ana and O(.~I'D prior to issuance of building permits. <br /> <br />Ti.ming of lmplementationNerification: Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Written evidence provided by applicant & <br />OCTD <br /> <br />Re.spollsible Parties: <br /> <br />Engineering Services Manager, Design <br />Engineering Division <br /> <br />Verification (Name & Date): <br /> <br />J B 1/08850001.A A-8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.