My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
90-098
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1990
>
90-098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2015 1:46:21 PM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
90-98
Date
10/1/1990
Document Relationships
90-099
(Amended By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26. <br /> <br />Landscape plantings and signs shall be limited by the project applicant to 36 inches in <br />height within 25 feet of project driveways to ensure good visibility. The City of Santa <br />Ana Planning Department shall review and approve landscape plans prior to issuance <br />of grading permits. <br /> <br />Ti~llirlg of Implementation/Verification: Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Landscape plans check and field inspection <br /> <br />Responsible Parties: <br /> <br />Case Planner & Landscape Associate; <br />Planning Division <br /> <br />Verification (Name & Date): <br /> <br />437 <br /> <br />27. <br /> <br />To ensure smooth traffic operations for vehicles entering and exiting the site, a striped <br />median shall be provided by the project applicant on Susan Street. The City of Santa <br />Ana Public Works Department shall review and approve onsite roadway improvements <br />prior to issuance of building permits. <br /> <br />Timing of ImplementationNerification: Prior to building permit issuance <br /> <br />Mq:thQd of Verification: <br /> <br />Improvements plan check and field <br />inspection <br /> <br />Responsible Parties: <br /> <br />Engineering Services Manager, Design <br />Engineering Division <br /> <br />Verification (Name & Date): <br /> <br />AIR QUALITY <br /> <br />28. <br /> <br />The applicant shall implement fugitive dust suppression measures in accordance with <br />South Coast Air Quality Management District's Rule 403. Implementation of these <br />measures shall be monitored and reported to the City of Santa Ana. <br /> <br />Timing of Implementation/Verification: <br /> <br />Method of Verification: <br /> <br />Responsible Parties: <br /> <br />Verification {Name & Date): <br /> <br />Prior to grading permit issuance <br /> <br />Grading plan check and field inspection <br /> <br />Environmental Coordinator, Planning <br />Division <br /> <br />JB 1/08850001.A A-10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.