My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
90-098
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1990
>
90-098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2015 1:46:21 PM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
90-98
Date
10/1/1990
Document Relationships
90-099
(Amended By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
436 <br /> <br />23. <br /> <br />The project applicant shall implement the proposed Transportation Demand <br />Management (TDM) Plan for the new development proposed within the Lake Center <br />specific development area. The TDM Plan shall be administered by an onsite <br />coordinator who shall be the responsibility of the property owner. <br /> <br />Timing of ImplementationNerification: Ongoing during life of project <br /> <br />Method of Verification: <br /> <br />Written evidence provided by applicant on <br />an annual basis <br /> <br />Responsible Parties: <br /> <br />Engineering Services Manager, Design <br />Engineering Division <br /> <br />Verification (Name & Date): <br /> <br />24. <br /> <br />Lighting plans prepared by the project applicant shall be revised and approved by the <br />City of Santa Aha prior to building permit issuance to ensure that pedestrian access <br />routes to the bus stop at Sunflower and Susan are adequately illuminated. <br /> <br />Timing of ImplementationNerificatio0: Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Plan check and field inspection <br /> <br />Responsible Parties: <br /> <br />Engineering Services Manager, Design <br />Engineering Division, & Community <br />Services Division, Police Department <br /> <br />Verification (Name & Date): <br /> <br />25. <br /> <br />A stop sign shall be installed by the project applicant at all driveway locations to <br />control outbound traffic flows. The City of Santa Aha Public Works Department <br />shall review and approve placement of stop signs prior to issuance of buikling permits. <br /> <br />Timing of Implementation/Verification: Prior to building permit issuance <br /> <br />Method o[ Verificalion: <br /> <br />Improvements plan check and field <br />inspection <br /> <br />Responsible Parties: <br /> <br />Engineering Services Manager, Design <br />Engineering Division <br /> <br />Verification (Name & Date); <br /> <br />J B 1/08850001.A A-9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.