My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
90-098
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1990
>
90-098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2015 1:46:21 PM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
90-98
Date
10/1/1990
Document Relationships
90-099
(Amended By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
439 <br /> <br />Fire Protection Services <br /> <br />32. The project applicant shall pay a fire facilities fee to the city for acquisition of fire <br /> <br />department personnel and equipment. <br />Timing of Implementation/Verification: <br /> <br />Method of Verification: <br /> <br />Responsible Parties: <br /> <br />Verification (Name & Date): <br /> <br />Prior to building permit issuance <br />Fee receipt (proof of payment) <br /> <br />Sr. Plan Check Engineer, Building Division <br />& Deputy Chief/Fire Marshall, Fire <br />Prevention Division <br /> <br />33. <br /> <br />Prior to building permit issuance, the City of Santa Aha shall require that the project <br />plans include built-in fire protection in individual buildings when circulated fire flow <br />exceeds 3,500 gallons per minute. <br /> <br />Timing of ImplementationNerification: Prior to building permit issuance <br /> <br />Mt;thod of Verification: <br /> <br />Building plans check and field inspection <br /> <br />Responsible Parties: <br /> <br />Deputy Chief/Fire Marshall, Fire <br />Prevention Division, & Engineering <br />Services Manager, Design Engineering <br />Division <br /> <br />Verification (Name & Date): <br /> <br />Utilities <br /> <br />34. <br /> <br />Reinforcement of onsite telephone facilities shall be implemented by the project <br />applicant. Onsite telephone facilities intended for acceptance by Pacific Bell shall <br />be built to Pacific Bell specifications. <br /> <br />Timing of lmplementationNerification: Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Improvements phm check and written <br />verification from Pacific Bell <br /> <br />Responsible Parties: <br /> <br />Environmental Coordinator, Phmning <br />Division, & Engineering Services Manager, <br />Design Engineering Division <br /> <br />Verification (Name & Date): <br /> <br />JB 1/08850001.A A-12 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.