My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
90-098
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1990
>
90-098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2015 1:46:21 PM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
90-98
Date
10/1/1990
Document Relationships
90-099
(Amended By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
440 <br /> <br />35. <br /> <br />Prior to building permit issuance, the project applicant shall consult with Southern <br />California Edison (SCE) and Southern California Gas (SCG) representatives to ensure <br />the proposed project design is compatible with existing electrical and natural gas <br />services, respectively, and to reduce impacts of possible short-term outages to existing <br />customers during construction. <br /> <br />Timing of Implementation/Verification: Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Improvements plan check and written <br />verification from Southern California <br />Edison and Southern California Gas <br /> <br />Responsible parties: <br /> <br />Sr. Plan Check Engineer, Building Division <br />& Engineering Services Manager, Design <br />Engineering Division <br /> <br />Vq:rification (Name & Date): <br /> <br />36. <br /> <br />Prior to issuance of building permits, the City of Santa Ana shall determine through <br />plan reviews that all buildings constructed by the project applicant within the project <br />site shall adhere to the State Title 24 energy standards, which set forth energy <br />conservation requirements. <br /> <br />Timing of Implementation/Verification: Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Building and architectural phm checks and <br />field inspection <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Check Engineer, Building DMsion <br /> <br />Verification (Name & Date): <br /> <br />37. <br /> <br />Prior to issuance of building permits, the City of Santa Ana shall determine through <br />plan reviews that all appliances to be installed by the project applicant within thc <br />project site shall be energy efficient in accordance with the Calilbrnia Administrative <br />Code, Title 20, Chapter 2, Subchapter 4, Article 4. <br /> <br />Tilltjn_e of lmplementationNerification: Prior to building permit issuance <br /> <br />Method o[ Verification: <br /> <br />Building and architectural plan checks and <br />field inspection <br /> <br />R,~isponsible Parties: <br /> <br />Sr. Plan Check Engineer, Building Diviskm <br /> <br />Verification (Name & Date); <br /> <br />J BI/08850001.A A-13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.