Laserfiche WebLink
442 <br /> <br />40. <br /> <br />Prior to building permit issuance, the City of Santa Aha Public Works Department <br />shall determine that water conservation measures are incorporated into the site design <br />in accordance with applicable state and city statutes and policies, including the use of <br />low-flush toilets, Iow-flow faucets, self-closing valves on drinking fountains, water <br />pressure-reducing valves, low-water-using plants in landscaping, and efficient landscape <br />irrigation systems that minimize runoff and evaporation and maximize water reaching <br />plant roots. <br /> <br />Timing of Implementation/Verification: Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Landscape plan check and building <br />(plumbing) plan check and field inspection <br /> <br />Responsible Parties: <br /> <br />Engineering Services Manager, Design <br />Engineering Division <br /> <br />Verification (Name & Date): <br /> <br />41. <br /> <br />Prior to building permit issuance, onsite wastewater collection facilities needed to serve <br />the project shall be reviewed and approved by the City of Santa Aha Public Works <br />Department and shall be installed by the project applicant. <br /> <br />Timing of ImpJgll~entation/Verification: Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Improvements plan check and field <br />inspection <br /> <br />Responsible Parties: <br /> <br />Engineering Services Manager, Design <br />Engineering Division <br /> <br />Verification ~Name & Datq:); <br /> <br />42. <br /> <br />Prior to building permit issuance, site plans shall be reviewed by the City of Santa <br />Aha Public Works Department to verify that adequate space is provided onsite for <br />recycling receptacles. <br /> <br />Timing of ImplcmentationNerificafion: Prior to building permit issuance <br /> <br />Method of Verificatio[l: <br /> <br />Building plans check and field inspection <br /> <br />Responsible Partie~: <br /> <br />Engineering Services Manager, Design <br />Engineering Division <br /> <br />Verification (Name & Date); <br /> <br />JBI/08850001.A A-15 <br /> <br /> <br />