Laserfiche WebLink
44i <br /> <br />38. <br /> <br />The project applicant shall consult with SCE and SCG concerning energy conservation <br />programs that could be incorporated into the project during construction. <br /> <br />Timing of ImplementationNerification: Prior to building permit issuance <br /> <br />Method of Verificatiorl: <br /> <br />Written verification from Southern <br />California Edison & Southern California <br />Gas <br /> <br />Responsible Parties: <br /> <br />Environmental Coordinator, Planning <br />Division <br /> <br />Verification (Name <br /> <br />39. <br /> <br />Prior to building permit issuance, plans for private onsite water supply facilities to <br />serve the project (fire hydrants and water lines) shall be reviewed and approved by the <br />City of Santa Aha Public Works Department, and shall be installed subsequently by <br />the project applicant. <br /> <br />Timing of lmplementationNerificatjon: Prior to building permit issuance <br /> <br />Method of Veri§cati0~t: <br /> <br />Improvements plan check and field <br />inspection <br /> <br />Responsible Parties: <br /> <br />Deputy Chief/Fire Marshall, Fire <br />Prevention Division, & Engineering <br />Services Manager, Design Engineering <br />Division Manager <br /> <br />Verification (Name & Date); <br /> <br />JB 1/08850001.A A-14 <br /> <br /> <br />