My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
90-098
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1990
>
90-098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2015 1:46:21 PM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
90-98
Date
10/1/1990
Document Relationships
90-099
(Amended By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
394 <br /> V. EFFECTS DETERMINED TO BE MITIGABLE TO A LEVEL LESS TH,~N <br /> SIGN~[F1CANT <br /> <br />EARTH RESOURCES <br /> <br />The proposed project site is in an area of potential earthquake activity. It has potentially <br />expansive soils and groundwater seepage at 12 feet below the surface. Excavation and compaction <br />of the soils will be required for the construction of the proposed project. <br /> <br />Finding <br /> <br />Finding 1: Changes or alterations have been required in, or incorporated into, the project which <br /> avoid or substantially lessen the significant environmental effect identified in the final <br /> EIR. <br /> <br />Facts in Support of Finding <br /> <br />The grading activities (including corrective grading measures), engineering techniques and seismic <br />design criteria will mitigate any possible impact resulting from geologic/soils conditions to a level <br />considered less than significant. The project will be developed in accordance with the <br />geotechnical report that was prepared for the project site, the requirements of the City of Santa <br />Aha Grading Ordinance and state building codes/ordinances. The significant effect has been <br />eliminated or substantially lessened to a level less than significant by virtue or' project design <br />considerations and the mitigation measures identified in the Final EIR and incorporated into the <br />project. This measure is as follows: <br /> <br />Grading shall be conducted in accordance with plans prepared by a civil engineer <br />and based on recommendations of a soil engineer and an engineering geologist <br />subsequent to the completion of a comprehensive soil and geologic investigation <br />for the proposed structures. Permanent reproducible copies of the "Approved <br />a~ Builff grading plans on standard size sheets shall be furnished to tile BuikJing <br />Department. <br /> <br />All structures shall be designed in accordance with thc seismic design provisions <br />of the Uniform Building Codes to promote safety in the event of an earthquake. <br /> <br />J B 1/08850001.SOF 6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.