Laserfiche WebLink
Consideration will be given to the provision of <br />com, ealent bus shelters and bus turnouts <br />along Bristol Street to encourage the use of <br />public transportation, <br /> <br />The use of energy efficient lighting along <br />Bristol Street (low pressure sodium vapor <br />lights) will be considered to reduce emissions <br />at the power plant serv/ng the area. (AQMP <br />control measure Nll.) <br /> <br />Traffic signals along Bristol Street will <br />continue to be synchronized. (AQMP control <br />measures K2.) <br /> <br />Construction activities will be halted during <br />Stage One and Stage Two smog ater~s. <br /> <br />Noise <br /> <br />Replacement of existing barriers that are <br />removed m widen the street, by solid barriers <br />at least six feet high. <br /> <br />Construction of six-foot block walls on corner <br />lots with access to cross streets, where <br />adequate vehicular sight distances can be <br />maintained. <br /> <br />T~min~ of Imnlementation <br /> <br />During preparation of street improvement <br />plans. <br /> <br />During preparation of street improvement <br />plans. <br /> <br />On~ing. <br /> <br />During all construction activities. <br /> <br />During preparatian of street improvement <br />plans and during construction. <br /> <br />During preparation of street improvement <br />plans and during construction. <br /> <br />Res ible n i ie <br /> <br />City Public Works Agency <br />Consulting Engineer <br /> <br />City Public Works Agency <br />Consulting Engineer <br /> <br />City Public Works Agency <br /> <br />Construction Contractor <br />City hispector <br /> <br />City Public Works Agency <br />Consulting Engineer <br />Construction Contractor <br /> <br />City Public Works Agency <br />Consulting Engineer <br />Construction Contractor <br /> <br /> <br />