My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
90-113
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1990
>
90-113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2015 1:52:56 PM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
90-113
Date
12/17/1990
Document Relationships
91-056
(Amended By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mi i a ion Men nre <br /> <br />Prohibit U-turns and provide fight-toru <br />overlaps with left-tom phasing at the <br />intersection of Bristol Street with Memory <br />Lane and 17th Street. <br /> <br />Provide protected left-tom phasing in all <br />directions of the intersections along Bristol <br />Street at Metoo~ Lane, 17th Street, First <br />Street, Edinger Avenue, and Warner Avenue. <br />Provide protected left-turn phasing on Bristol <br />Street in the north~south direction at the <br />Bishop Street/Willits Street and the <br />McFadden Avenue intersection. <br /> <br />Provide protected, left-turn phasing on Bristol <br />Street, in the north~south direction, at the <br />Civic Center Drive, 5th Street, and Santa Ann <br />Boulevard intersections. <br /> <br />Widen the bridge over Santiago Creek to a <br />100-foot right-of-way with three through lanes <br />in each direction. <br /> <br />Remove yellow school crosswalk markings on <br />the north leg of Bristol Street at St. Andrews <br />Place and direct pedestrians to use the traffic <br />signal at Glenwood Place to cross Bfistol <br />Street. Re-establish safest route to school <br />utilizing signalized intersection. <br /> <br />~__Lming of lmulementation <br /> <br />During final design and construction. - '. <br /> <br />During final design and construction. <br /> <br />During final design and construction. <br /> <br />During final design and construction_ <br /> <br />During construction.' <br /> <br />3'/ <br /> <br />Responsible Entities <br /> <br />City Public Works Agency <br />Consulting Engineer <br />City Traffic Engineer <br />Construction Contractor <br />CiW inspector(s) <br /> <br />City Public Works Agency <br />Consulting Engineer <br />City Traffic Engineer <br />Construction Contractor <br />City Inspector(s) <br /> <br />City Public Works Agency <br />City Traffic Engineer <br />Consulting Engineer <br />Construction Contractor <br />City Inspector <br /> <br />City Public Works Agency <br />City Traffic Eugineer <br />Consulting Engineer <br />Construction Contractor <br />City Impector <br /> <br />City Traffic Engineer <br />Construction Contractor <br />City [ospector <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.