Laserfiche WebLink
Mitigation Measure <br /> <br />11. <br /> <br />1X <br /> <br />Provide a far-side bus mm-out on the west <br />side of Bristol Street south of Santa Ama <br />Boulevard. <br /> <br />13. <br /> <br />Provide far-side bus turn-out areas on Bristol <br />Su'eet in both northbound and southbound <br />directions at the following intersections: <br /> <br />a. First Street (northbound only) <br />b. McFadden Avenue <br />c. Edinger Avenue <br />d. Warner Avenue <br />e. Santa Ann Boulevard (southbound <br /> only) <br /> <br />Prohibit parking along both sides of Bristol <br />Streeh from Memory Lane to Warner <br />Avenue. <br /> <br />14. ~Provide Si~tntal coordination system along the <br /> nristol Street corridor to maxim/ze operating <br /> efficiency of traffic signals. <br /> <br /> Construction Impacts <br /> <br />1. SCAQMD Rule 403 will be adhered to, <br /> ensuring the eleannp of construction-related <br /> dirt on approach routes to the site. <br /> <br />Timin~ of lmnlementation <br /> <br />During final design and construction. <br /> <br />During final design and construction. <br /> <br />During final design and coastmction~ <br /> <br />Already implemented and continuing. <br /> <br />During all construction activities. <br /> <br />Rns~onMble Entitieq <br /> <br />City Public Works Agency <br />City Traffic Engineer <br />Consulting Engineer <br />Construction Contractor <br />City inspector <br /> <br />City Public Works Agency <br />City Traffic Engineer <br />Consulting Engineer <br />ConstTUCfiOn Contractor <br />City Inspector <br /> <br />City Public Works Agency <br />City Traffic Engineer <br />Consulting Engineer <br />Coastruction Contractor <br />City Inspector <br /> <br />City Public Works Agency <br /> <br />Construction Contractor <br />City Inspector(s) <br /> <br />39 <br /> <br /> <br />