My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
90-117
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1990
>
90-117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:32:04 PM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
90-117
Date
12/17/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i37, <br /> <br />De <br /> <br />garage shall be Incorporated into tile final design plans. <br /> <br />Impact: <br /> <br />A slight potential exists that the effects of dewatering, pile <br />driving, and lateral deflection of excavation shorings may cause <br />subsidence and/or lateral movement of soils on the project site. <br /> <br />Finding: <br /> <br />Changes or alterations have been required in, or incorporated <br />Into the project, or are otherwise being implemented which will <br />mitigate this Impact to a level of Insignificance, In that: <br /> <br />(l) <br /> <br />A pile driving monitoring and documentation program shall <br />be conducted in accordance wlth recommendations contained <br />In Sectlon 5.6 of Appendix E of the Draft EIR. The <br />program shall be conducted by qualified professionals <br />experienced at assessing residential distress. Selection of <br />the consultant shall be approved by the City Engineer. <br /> <br />(2) <br /> <br />The program shall include a detailed preconstruction survey <br />to document the present condition of all buildings and <br />facilities within a radius of approximately 300 to 500 feet of <br />the project as determined by the geotechnical consultant <br />and the City Engineer. Photographs, crack surveys, and <br />Installation of a reference benchmark beyond the zone of <br />influence shall be Included in the preconstructlon survey. <br />The program shall Include monitoring during pile-driving <br />operations and inspection of properties following completion <br />of operations. <br /> <br />Impact: <br /> <br />The project site Is expected to experience moderate to severe <br />groundshaking in the event of a major earthquake on a regional <br />fault. {The risk is no greater or lesser than for any other <br />structures in the general area, however.) <br /> <br />Finding: <br /> <br />Changes or alterations have been required in, or Incorporated <br />into the project, or are otherwise being implemented which will <br />mitigate this impact to a level of insignificance, in that: <br /> <br />All structures shall be designed and constructed in <br />accordance with seismic design requirements of the Uniform <br />Building Code or Structural Engineers Association of <br />California. <br /> <br />13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.