Laserfiche WebLink
154 <br /> <br />9. Verify compliance with items number 1 through 13 of Section A. <br /> <br />Compliance with the mitigation measures identified below will be required <br />as part of the on-going operation of the project project: <br /> <br />Hardseape area maintenance and sweeping shall be conducted regularly <br />(without the use of water) to reduce the amount of pollutants <br />entering the City drainage system. <br /> <br />2. Comply with TDM program requirement for annual reporting and <br /> performance requirements. <br /> <br /> <br />