Scheduling of construction actwity for the project will be coordinated with the <br />Santa Ana Unified School District and officials at the Remington Elementary <br />School with particular attention to potential disruption of traffic by construction <br />vehicles, access routes for construction vehicles and noise and dust generation <br />during demolition of the apartments and construction of each phase of the proposed <br />project. When possible, construction activmes will be scheduled to minimize <br />impacts and disruptions during school hours. <br /> <br />The Register will pay the school fees required under California Law, at a rate of <br />$0.26 per square foot, or as designated by the Santa Aoa Unified School District, of <br />new building space to the Santa Aha Unified School District prior to seeking a <br />building permit for the project from the City of Santa Aha, This fee will be used by <br />the School District to mitigate any impacts on existing schools as a result of the <br />proposed project. This fee is estimated at a maximum of $136,2:~7 for the total <br />project, based on $0.26 per square feet of new building space. <br /> <br />COORDINATION BETWEEN THE CALTRANS AND REGISTER PRO3ECTS <br /> <br />Significant Effect <br /> <br />Caltrans is currently pursuing the widening of I-3 in the vicinity of the proposed Register <br />project. The coordination of the I-5 and Register projects is necessary to ensure that <br />modifications to utilities and area roadways, in conjunction with each of the projects, is <br />conducted in an orderly and timely fashion. <br /> <br />Finding <br /> <br />Finding 1: <br /> <br />Changes or alterations have been required in, or incorporated into, the <br />project which avoid or substantially lessen the significant environmental <br />effect identified in the Final EIR. <br /> <br />Facts in Support of the Finding <br /> <br />The following mitigation measures will ensure that the Register and Caltrans projects <br />are coordinated: <br /> <br />The Register will review the project site plans and schedule with Caltrans District <br />12 Project Development staff. <br /> <br />If the Register project preceeds the Caltrans project, the Register will construct a <br />cul-de-sac at the northwest end of Eastside Street to allow continued access to the <br />residences at the north end of Eastside Avenue on existing public roadway. <br /> <br />If the Register project preceeds the Caltrans project, the Register will be <br />responsible for relocating the impacted utilities in Fruit Street. <br /> <br />In the event the Register expansion project crosses over, under, or in any way <br />infringes on the existing or planned right-of-way for I-3, the Register shall obtain <br />an Encroachment Permit from Caltrans District 12 prior to initiating any site <br />preparation, grading, or construction activities that would physically impact 1-3. <br /> <br /> <br />