My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
91-003
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1991
>
91-003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:37 PM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
91-3
Date
1/7/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br />MITIGATION blON~ORING PROGRAM ACl'~VIT1ES <br /> <br />MitilRation laea~J~re <br /> <br />GEOLOGYr SOILS AND SEISMIC <br /> <br />Prior to final design, the laboratory testing of subsurface soils will <br />be completed and appropriate engineering and design measures will <br />be incorporated in the finaJ design. <br /> <br />All buried metallic components considered sensitive to corrosion will <br />be protected from du'ect contact with soils, <br /> <br />Due to the moderate to high compressibility of soils to a depth of <br />20 feet, the proleCt design will include either precast concrete piles <br />or cast-in-drilled hole concrete piles ior the press mat foundations <br />and for other heavy column ibads. <br /> <br /> Timing o! <br />Implementation <br /> <br />Prior to completion of final design <br /> <br />Final design <br />Final design <br /> <br />Floor slabs in the newsprint storage/lay down area, sub)ecl to loads Final design <br />on the order of ~00 pounds per square loot, will be provided <br />structural support throngh provision of either piles or partial over <br />excavation and compaction of loose soils. <br /> <br />Site drainage will be designed to limit post construction infiltration <br />of moisture into subsoils located below structures. <br /> <br />All structures will be designed in accordance with the City of Santa <br />Aha Seismic Code and the Uniform Building Code. <br /> <br />Final design <br />Final design <br /> <br /> Responsible <br />Agency/Organization <br /> <br />1: Register <br />A: City of Santa Aha <br /> <br />l: Register <br />^: City of Santa Aha <br /> <br />h Register <br />^: City of Santa Ana <br /> <br />h Register <br />A: City of Santa Aha <br /> <br />l: Register <br />A: City of San[a Aha <br /> <br />h Register <br />A: City of Santa Aha <br /> <br />1: Agency or party responsible for implementing the mitigation measures, <br />A: Agency or party responsible for approving implementation and verifying that measure was implemented. <br /> <br />Mitigation measures are from the Draft EIR (October 1990) and the Response to Comments Report (December 1990) <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.