Laserfiche WebLink
TABLE 1 <br />MITIGATION MONITORING PROGRAM ACTIVITIES <br /> <br />Page 2 ot 16 <br /> <br />Mitilmtion Measure <br /> <br />1. The project will require installation and maintenance of erosion <br /> control devices in accordance with the policies of the City of Santa <br /> Ans. These devices will not be removed or modified without the <br /> approval of the City Building officials. <br /> <br />2. During the rainy season, equipment and materials will be stored on <br /> site for rapid construction of temporary erosion control devices. <br /> Workers and equipment will be available for emergency construction <br /> and maintenance of these devices. <br /> <br /> Removable erosion protection devices will be in place at the end of <br /> each working day when the five dey rain probability forecast <br /> exceeds ~0 percent. <br /> <br /> After a rainstorm, the contractor will remove all silt and debris <br /> from streets~ check berms and basins. <br /> <br /> Should any project generated sediment be deposited in City storm <br /> drains during construction, the Register shall fund any required <br /> cleanup to the mutual satisfaction o! the Register and the City. <br /> <br /> Graded areas on the site perimeter will be graded to drain away <br /> from the face of slopes at the end of each working day. Drainage <br /> will be directed toward desiring facilities. <br /> <br /> The contractor will take necessary precautions to prevent trespass <br /> or public access onto areas where water is impounded. <br /> <br /> An emergency telephone number will be posted by the Contractor <br /> for immediate notification if emergency conditions arise. <br /> <br /> The design of the on site improvements will use existing and new <br /> landscaped areas and other pervious surfaces to control and filter <br /> surface rum)fl prior to discharge from the site. <br /> <br />6, <br /> <br />7. <br /> <br />g. <br /> <br />9. <br /> <br /> Timing of <br />Implementat ion <br /> <br />Final design <br /> <br />Apartment demolition and construction <br />of project. <br /> <br />Apartment demolition and construction <br />of the pro)eOt <br /> <br />Apartment demolition and construction <br />of the project <br /> <br />Apartment demolition and construction <br />of the proIeCt. <br /> <br />Apartment demolition and construction <br />of the project <br /> <br />Apartment demolition and construction <br />of the project <br /> <br />Apartment demolition and construction <br />of the protect <br /> <br />Final design <br /> <br /> Responsible <br />Agency/Organization <br /> <br />A: City of Santa Aha <br /> <br />1: Register, Project Contractors <br />A: City of Santa Aaa <br /> <br />I: Register, Project Contractors <br />A: City of Santa Aaa <br /> <br />h Register, Project Contractors <br />A: City of Santa Ana <br /> <br />1: Register, Project Contractors <br />A: City of Santa Aaa <br /> <br />1: Register, Project Contractors <br /> City of Santa Aaa <br /> <br />h Register, Project Contractors <br />A: City of Santa Aaa <br /> <br />h Register, Project Contractors <br />A: City of Santa Ana <br /> <br />Register <br />City of Santa Ana <br /> <br /> <br />