Laserfiche WebLink
TABLE 1 <br />MITIGATION MONITORING PROGRAM ACTIVITIES <br /> <br />Page 3 of 1£ <br /> <br />Mit/~ation Measure <br /> <br />10. <br /> <br />11. <br /> <br />ParkLng lots and structures will be cleaned regularly to remove silt, <br />dust, debris~ oiJ~ grease, metals and other constituents. <br /> <br />A clarifiyin8 catch basin will be provided by the Register in the <br />Register parking lot approximately 30 feet east of the luture Fruit <br />Street cul-qte-sac. This catch basin will contain a c~amber to <br />collect parking lot silt and other pollutants. The chamber will he <br />removed and debris cleaned out and properly disposed o! on an as <br />needed basis. <br /> <br />LAND USE <br /> <br />1. Relocation Assistance Plan - See Below <br /> <br />The Register will apply for a GPA and zone changes for the apart- <br />ment sites, the street segments a~d the two [~arcels on Grand <br />Avenue south of Sixth Street (zone change only), as part of the <br />negotiations tur the amendment to the existing Development <br />Agreement with the City of Santa Aha, to bring the zoning and <br />General Plan ~esignation tot the site into compliance with the <br />planned land use. <br /> <br />Sh~t Term Construction Emissions <br /> <br />Concurrent with an application lor a grading permit, the Register <br />will provide suppression measures tor fugitive dosl in accordance <br />with AQMD Rules. These measures shall be incorporated as condi- <br />tions of any grading permit prior to issuance ol the permit. <br /> <br />the apartments will be verified by a certified contractor. If <br />asbestos is found, all removal activities will be conducted in <br />compliance with AQMD Rule 1403: Asbestos Emissions trom <br />Demolition and Renovation Activities. <br /> <br />All construction and demolition equipment shall be maintained in <br />tune per manofacturer*s specifications. <br /> <br /> Timing of <br />Implementation <br /> <br />Operations (alter construction is <br />complete) <br /> <br />During Final Design <br /> <br />Operations (on-going, after construction <br />of the catch basin) <br /> <br />After EIR is certified <br />After EIR is certified <br /> <br />Grading permit application <br /> <br />Prior to application for demolition <br />permit <br /> <br />Demolition of apartments and <br />construction of project <br /> <br /> Responsible <br />^~:ency/Or ~:anizatinn <br /> <br />1: Register <br />A: City of Santa Aha <br /> <br />h Register <br />A: City of Santa Aha <br /> <br />h Register <br />A: City ol Santa Aha <br /> <br />h Regisler, City of Santa Aha <br />A: City of Santa Ana <br /> <br />h Register <br />A: City of Santa Aha <br /> <br />h Register, Asbestos Contractor <br />A: City of Santa <br /> <br />I: Register, Project Contractors <br />A: City of Santa Aha <br /> <br /> <br />