Laserfiche WebLink
TABLE 1 <br />MONITORING PROGRAM ACTIVITIES <br /> <br />Page 10 of 16 <br /> <br />Mititation Measure <br /> <br />The remainder of the parking and roadway lightmg will be 20-fnot <br />high poles with cutoffs on the property line side. The light~ng levels <br />will be the minimum recommended by the Illuminating Engineering <br />Society of North America. <br /> <br />The interior lighting in the porkmg structure in Phase II will be high <br />intensity and will be angled to reduce light escaping from the <br />facility and onto adjacent land uses. C~ all levels o~ lhe garage at <br />or above grade, the garage will be designed to prevent automobile <br />headlights from illuminating offsite. <br /> <br />The delivery truck routes through the site and the truck dock areas <br />adjacent to the press buildings will be designed to minimize any <br />fugitive light offsite from the trucks and the on site light fixtures. <br /> <br />Windows in lhe proposed structure will be recessed slightly to <br />mL~ize pote~t~ glare. <br /> <br />All trash receptacles will b~ within enclosures and will not he in <br />landscaped areas or in direct view from public streets. <br /> <br />go <br /> <br />The Register will install a wall and landscaping across Sixth Stree! <br />at McClay Street consistent with the existing wall and landscaping <br />along Sixth Street adjacent to the existing Register facilities. <br /> <br />PUBLIC SERVICES AND UTILITIES <br /> <br />WATER SUPPLY <br /> <br />Water conservation and management techniqoas will be incorporated <br />in the design, construction and operation of planned facilities <br />including the use of fixtures that use reduced volumes of water, <br />landscaping irrigation in early morning or evening hours to reduce <br />water lost to evaporation and use of drought tolerant plant species <br />for new landscaping. <br /> <br /> Timing of <br />Implementation <br /> <br />Final design and construction <br /> <br />Final design and construction <br /> <br />Final hesign and construction <br /> <br />Final design and construction <br />Final design <br /> <br />Prior to issuance o! Use and Occupancy <br />Permits <br /> <br />Fmal design and construction. Ongoing <br />during operations, <br /> <br /> Responsible <br />Agency/Organizaiwn <br /> <br />h Register <br />A: City of Santa Ana <br /> <br />h Register <br />A: City of Santa Arm <br /> <br />h Register <br />A: City of Santa Aha <br /> <br />I: Register <br />A: City of Santa Aha <br /> <br />h Register <br />A: City of Santa Ana <br /> <br />h Register <br />A: City of Santa Ara <br /> <br />h Register <br />A: City of Santa Aha <br /> <br /> <br />