Laserfiche WebLink
TABLE 1 <br />~TIC~TIO~ MONITORING PROG~ ACTI¥~ fm~ <br /> <br />Page 12ol 16 <br /> <br />Miti[ation Measure <br /> <br />All wastewater will be directed to the sewer lacilities at Fruit <br />Street and Grand Avenue and no discharges will be directed to the <br /> <br />No new connections will be made to the existing 6-inch sewer line on <br />Sixth Street. <br /> <br />STORM DR~MI~ <br /> <br />The storm drains identified in Figure 3q; will be incorporated in the <br />tiual design tor the proleCt and will be submitted to the City ot <br />Santa Aua tot review and approval. <br /> <br />A detailed Hydrology and Hydraulic Study will be prepared by the <br />Register to support the final proleCt design and proposed storm drain <br />facilities. The cnsL~ for t. hi* study shall he Ix~rne by the Register. <br /> <br />Any modifications to the existing or planned storm drain facilities or <br />any new storm drains, as determined by the Hydrology and Hydraulic <br />Study, will be mcurporated in the final project design. The costs for <br />the design and implementation of these improvements will be borne <br />by the Register. <br /> <br />As part of the building permit application for each phase of the <br />~roposed project, Register will pay to the City of Santa Ana fees ol <br />3,510, or as designated by the City of Santa Ana, per acre ot new <br />development, to the nearest 1/100th of an acre, for the Drainage <br />Assessment Area. <br /> <br />Source reduction techniques and recycling to minimize solid w~ste <br />generation at the expanded Register lacility will be an extension o! <br />tbe existing Register materials recycling program. In addition, the <br />Register will continue to evaluate additional ways and opportunities <br />to recycle materials and otherwise reduce the amounts of solid <br />waste generated by the proposed project. <br /> <br />When possible, the Register will use biodegradable materials for its <br />activities and will encourage the use ol such materials by vendors. <br /> <br /> Timing of <br />Implementation <br /> <br />Final design and construction <br /> <br />design and construction <br /> <br />Final design and construction <br /> <br />Final design <br /> <br />Final design <br /> <br />Building permit application <br /> <br />Ongoing <br /> <br />Ongoing <br /> <br /> Responsible <br />Agenc¥/Organizat ~on <br /> <br />Register <br />City of Santa Aha <br /> <br />h Register <br />A: City ol Santa Ama <br /> <br />h Register <br />A: City of Santa Aha <br /> <br />1: Register <br />A: City of Santa Aha <br /> <br />1: Register <br />A: City of Santa Aha <br /> <br />h Register <br />A: City of Santa Aha <br /> <br />h Register <br />A: City ot Santa Ana <br /> <br /> Register <br />A: City of .%nra Ana <br /> <br /> <br />