My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
91-003
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1991
>
91-003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:37 PM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
91-3
Date
1/7/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br />MITIGATION MONITORING PROGRAM ACTIVITIES <br /> <br />Page 13 o! 16 <br /> <br />Mitigation Measure <br /> <br />The relocation of SCE facilities along Fruit Street will be <br />coordinated with Southern California Edmort Company (SCE). <br /> <br />The Register will grant SCE access easements to the SCE facilities <br />along Sixth Street. <br /> <br />The Register will coordinate with the SCE to incorporate energy <br />savings programs in the construction and operation of the expanded <br />facility. Incorporation of these programs and energy saving <br />technologies in the design and operation of the expansion facility <br />will contribute to overall regional reduction in long term energy <br />needs. <br /> <br />POLICE <br /> <br />1. All structures and parking lots constructed as part of the proposed <br /> proJeCt will comply with the provisions of Chapter g, Article Il, <br /> Division 3 of the Santa Aha Municipal Code (Building Security <br /> Ch-dinance). <br /> <br />2. The Register will coordinate with the Santa Arm Police Department <br /> (SAPD) on the demolition of the apartments and the construction oi <br /> the new structures to ensure that appropriate security and crime <br /> reduction elements are in place to reduce the potential for <br /> vandalism and other criminal activities during demolition and <br /> construction. <br /> <br />3. The apartments sites will be fenced prior to demolition and the <br /> fences will be maintained during the entire construction period. The <br /> Register will provide private security to this area for this entire <br /> period. <br /> <br /> The lighting of all the structures and parking facilities will be <br /> designed to facilitate emergency response and to discourage <br /> criminal incidents. <br /> <br /> Timing of <br />Implementation <br /> <br />Final design and construction <br />Final design and construction <br />Final design and construction <br /> <br />Final design and construction <br /> <br />On close of escrow for apartments site <br /> <br />Close of escrow for apartments site <br /> <br />Final design and construction <br /> <br /> Responsible <br />Al~enc¥/Orl~amzation <br /> <br />1: Register, SCE <br />A: SCE, City of Santa Aha <br /> <br />h Register, SCE <br />A: SCE, City of Santa Aha <br /> <br />h Register, SCE <br />A: SCE, City of Santa Aha <br /> <br />h Register <br />A: Santa ^ha Police Department <br /> <br /> Register, SAPD <br />A: SAPD <br /> <br />h Register <br />A: City of Santa Aha <br /> <br />h Register <br />A: City of Santa Aha <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.