Laserfiche WebLink
Set hearing <br />date - establish <br />drainage fees <br /> <br /> On recommendation of the Manager, and on motion of Councilman Brewer, seconded by <br /> Heinly and carried, the Clerk was instructed to publish a notice of hearing on the <br /> matter of the adoption of an Ordinance establishing drainage fee~ within the City; <br /> setting the date of hearing on November 20, _1961. <br /> <br />Appointment On motion of Councilman Heinly, .seconded by Brewer and carried, action was continue~ <br />Architectural and <br />Engineering services; until the next meeting on the oral request of the Manager for consideration of pro- <br />Municipal Stadium <br /> ~Y/.: d~ cedure for appointment of Architectural and Engineering services regarding the <br /> <br />Instructions to <br />City Manager <br />(Custodial charges <br />involving prisoners) <br /> <br />construction of a Municipal Stadium. <br /> <br />On motion of Councilm~ Brewer, seconded by Schlueter and carried, the Manager was <br /> <br />instructed to make payment to the County Sheriff's Department as has been done in <br /> <br />the past, regarding the bill presented to the City for custodial charges involving <br /> <br />Instructions to <br />City Manager <br />(Vehicle Par~ing <br />District No. 1) <br /> <br />prisoners arrested under City Ordinance provisions. <br /> <br />On motion of Coumcilm~ Hein~y, seconded by Brewer and carried, the Manager was <br /> <br />instructed to make a recommendation to the Council regarding the possible sale of <br /> <br />the present Vehicle Parking District lot and the acquisition of an equivalent <br /> <br />Release bond <br />Tract No. 2511 <br /> <br />parking lot. <br /> <br />On recCmmeadation of the Department of Public WorkS, 'and on motion of Councilman <br /> <br />Heinly, seconded by Schlueter and carried, bond in the sum of $265,000.00, filed <br /> <br />by Action Engineering Company, for the improvements on property located fmmediately <br /> <br />west of the Federal Con~nunications Commission Building, south of Edim~er Street and' <br /> <br />north of Harvard Street, consisting of approztm~tely 46 acres, or 190 lots, in Trac~ <br /> <br />Approve payment <br />A end D Const. Inc. <br />Crew 'and Dispatching <br />Building~ ~ <br /> <br />No. 3533, was ordered released and improvements accepted as completed. <br /> <br />On motion of Councilman Heinly, seconded by Schlueter and carried, the request of <br /> <br />the Department of Public Works was ~pp~ved f~oxtra work performed by the A and D <br /> <br />Construction, Inc., necessitated at the Crew and Dispatching Building, to connect <br /> <br />to existing gas line located elsewbere than shown on the plans, as follows: <br /> <br />Installation of extra plumbing piping $133.27; additional paving $49.50; and paint- <br /> <br />ing of interior metal grille and warehouse roof overhang $105.05, in the total <br /> <br />Approve payment <br />Paul Toberty <br />Paving Memory Lane <br />at Flower Street <br /> <br />amount of <br /> <br />On motion of Councll~e~ Heinly, seconded by Schlueter and carried, the request of <br /> <br />the Department of Public Works was a~mrOVed for payment to Paul Toberty, in the sum <br /> <br />of $1,840.00, to cover the cost of paving Memory l~ne at Flower Street, in return <br /> <br />for dedicating necessary right-of-way for the ulttm~te width of Memory Lane and the <br /> <br />Approve Payment <br />Griffith Company <br />Construct Fifth Street <br />Project No. 123 <br /> <br />cons truction of curb and gutter along Memory ~ne. <br /> <br />On motion of Councilman Heinly, seconded by Schlueter and carried, the request of <br />the Department of Public Works was approved for payment to Griffith Company, in the <br /> <br />sum of $172.66, for extra work to remove the aggregate base and over-excavate 12 inches <br /> <br />between stations 2~60 and ~412, on a time and material basis, due to waterline bremk <br /> <br />fleoding the area, in the construction of Fifth Street, from Harbor Boulevard to <br /> <br />the Santa Ana River, Project No. 123; Pacific Water Company to be billed for this <br /> <br />Plans and Specifications <br />Advertise for bids <br />Construct Camille Street <br />btn Corta Drive and Andres <br />Place; Project C-65 <br /> <br />On motion of Councilm~n Heialy, seconded by Schlueter and carried, the request of <br />the Department of Public Works was granted, the plans and specifications approved, <br />and the Purchasing Agent authorized to advertise for bids, for the construction of <br />Camille Street between Corta Drive and Andres Place, Project C-65; bids to be opened <br /> <br />Plans and Specifications <br />Miden Grand Avenue btn <br />17th St. and Santa Clara <br />Ave.; Project 127 <br /> <br />December ~, 1961. <br /> <br />On motion of Councilm-n Heinly, seconded by Schlueter and carried, the request of <br />the Department of Public Works was granted and the plans and specifications approv~l <br />for the widening of Grand Avenue between Seventeenth Street and Santa Clara Avenue~ <br />Project No. 127; permission to advertise for bidm will be requested after approval <br />of the plans and specifications by the State. <br /> <br /> <br />