Set hearing
<br />date - establish
<br />drainage fees
<br />
<br /> On recommendation of the Manager, and on motion of Councilman Brewer, seconded by
<br /> Heinly and carried, the Clerk was instructed to publish a notice of hearing on the
<br /> matter of the adoption of an Ordinance establishing drainage fee~ within the City;
<br /> setting the date of hearing on November 20, _1961.
<br />
<br />Appointment On motion of Councilman Heinly, .seconded by Brewer and carried, action was continue~
<br />Architectural and
<br />Engineering services; until the next meeting on the oral request of the Manager for consideration of pro-
<br />Municipal Stadium
<br /> ~Y/.: d~ cedure for appointment of Architectural and Engineering services regarding the
<br />
<br />Instructions to
<br />City Manager
<br />(Custodial charges
<br />involving prisoners)
<br />
<br />construction of a Municipal Stadium.
<br />
<br />On motion of Councilm~ Brewer, seconded by Schlueter and carried, the Manager was
<br />
<br />instructed to make payment to the County Sheriff's Department as has been done in
<br />
<br />the past, regarding the bill presented to the City for custodial charges involving
<br />
<br />Instructions to
<br />City Manager
<br />(Vehicle Par~ing
<br />District No. 1)
<br />
<br />prisoners arrested under City Ordinance provisions.
<br />
<br />On motion of Coumcilm~ Hein~y, seconded by Brewer and carried, the Manager was
<br />
<br />instructed to make a recommendation to the Council regarding the possible sale of
<br />
<br />the present Vehicle Parking District lot and the acquisition of an equivalent
<br />
<br />Release bond
<br />Tract No. 2511
<br />
<br />parking lot.
<br />
<br />On recCmmeadation of the Department of Public WorkS, 'and on motion of Councilman
<br />
<br />Heinly, seconded by Schlueter and carried, bond in the sum of $265,000.00, filed
<br />
<br />by Action Engineering Company, for the improvements on property located fmmediately
<br />
<br />west of the Federal Con~nunications Commission Building, south of Edim~er Street and'
<br />
<br />north of Harvard Street, consisting of approztm~tely 46 acres, or 190 lots, in Trac~
<br />
<br />Approve payment
<br />A end D Const. Inc.
<br />Crew 'and Dispatching
<br />Building~ ~
<br />
<br />No. 3533, was ordered released and improvements accepted as completed.
<br />
<br />On motion of Councilman Heinly, seconded by Schlueter and carried, the request of
<br />
<br />the Department of Public Works was ~pp~ved f~oxtra work performed by the A and D
<br />
<br />Construction, Inc., necessitated at the Crew and Dispatching Building, to connect
<br />
<br />to existing gas line located elsewbere than shown on the plans, as follows:
<br />
<br />Installation of extra plumbing piping $133.27; additional paving $49.50; and paint-
<br />
<br />ing of interior metal grille and warehouse roof overhang $105.05, in the total
<br />
<br />Approve payment
<br />Paul Toberty
<br />Paving Memory Lane
<br />at Flower Street
<br />
<br />amount of
<br />
<br />On motion of Councll~e~ Heinly, seconded by Schlueter and carried, the request of
<br />
<br />the Department of Public Works was a~mrOVed for payment to Paul Toberty, in the sum
<br />
<br />of $1,840.00, to cover the cost of paving Memory l~ne at Flower Street, in return
<br />
<br />for dedicating necessary right-of-way for the ulttm~te width of Memory Lane and the
<br />
<br />Approve Payment
<br />Griffith Company
<br />Construct Fifth Street
<br />Project No. 123
<br />
<br />cons truction of curb and gutter along Memory ~ne.
<br />
<br />On motion of Councilman Heinly, seconded by Schlueter and carried, the request of
<br />the Department of Public Works was approved for payment to Griffith Company, in the
<br />
<br />sum of $172.66, for extra work to remove the aggregate base and over-excavate 12 inches
<br />
<br />between stations 2~60 and ~412, on a time and material basis, due to waterline bremk
<br />
<br />fleoding the area, in the construction of Fifth Street, from Harbor Boulevard to
<br />
<br />the Santa Ana River, Project No. 123; Pacific Water Company to be billed for this
<br />
<br />Plans and Specifications
<br />Advertise for bids
<br />Construct Camille Street
<br />btn Corta Drive and Andres
<br />Place; Project C-65
<br />
<br />On motion of Councilm~n Heialy, seconded by Schlueter and carried, the request of
<br />the Department of Public Works was granted, the plans and specifications approved,
<br />and the Purchasing Agent authorized to advertise for bids, for the construction of
<br />Camille Street between Corta Drive and Andres Place, Project C-65; bids to be opened
<br />
<br />Plans and Specifications
<br />Miden Grand Avenue btn
<br />17th St. and Santa Clara
<br />Ave.; Project 127
<br />
<br />December ~, 1961.
<br />
<br />On motion of Councilm-n Heinly, seconded by Schlueter and carried, the request of
<br />the Department of Public Works was granted and the plans and specifications approv~l
<br />for the widening of Grand Avenue between Seventeenth Street and Santa Clara Avenue~
<br />Project No. 127; permission to advertise for bidm will be requested after approval
<br />of the plans and specifications by the State.
<br />
<br />
<br />
|