Laserfiche WebLink
569 <br /> <br /> (3) If a public hearing is set for the draft EIR and the <br />date set for such hearing is beyond the expiration date set <br />according to (1) or (2) above, the period of public review is <br /> <br />thereby extended to include such hearing date; provided, however, <br />hearings shall not be scheduled or continued so as to exceed a <br />maximum period of 90 days from the date following publication of <br />notice of preparation of the draft EIR. <br /> <br />E. Responses to Comments. <br /> <br /> The Environmental Analyst <br />during the period of public <br />period: <br /> <br />shall respond to comments received <br />review within the following time <br /> <br /> (1) Three weeks <br /> <br /> (2) A time which is reasonable in <br />comments raise complex issues or require <br />or Negative Declaration. <br /> <br />if the comments do not raise complex issues. <br /> <br /> the circumstances if the <br /> <br /> a completely revised EIR <br /> <br />41 <br /> <br /> <br />