Laserfiche WebLink
Council Chamber <br />Santa Ana City Hall <br />June 4, 1962 7:30 P.M. <br /> <br />City Council met in regular session. <br />Meeting called to order by the Mayor. <br /> <br />Present: <br /> <br />Councilmen Royal E. Hubbard, Henry H. Schlueter, <br /> Bob Brewer, A. A. Hall <br /> <br />Absent: Councilmen Dale H. Hein].v <br /> <br />The Pledge of Allegiance w~s given. <br /> <br />Invocation was given by Ralph Worsham, The Register. <br /> <br />Each member of the City Council having received copies of the Minutes of <br />May 18 and May 21, 1962, reading of the Minutes was dispensed with and <br />approved as mailed, on motion of Counc~ lm~u .Hubbard, seconded by Brewer <br />and carried. <br /> <br /> A tabulation of $ids was presented for construction of additions to the Bristol <br /> <br />Bid acceptance <br />Construct additions <br />to Bristol Street <br />Booster Pumping <br />Stat ion <br /> <br />Street Booster Pumping Station, as follows: <br /> <br />Ecco <br />Hydro Construction Co. <br />Rosecrans Construction Co. <br />Triad Piping & Construction Co. <br />Pylon, Inc. <br /> <br />Total Bid Bond <br />$~23,435.oo <br />92, 76~. O0 10~ <br />90,374.00 10~ <br />8~, 22o.oo <br />zo7, o3~.oo <br /> <br />On rec~endation of the Manager, and on motion of Councilman Brewer, seconded by <br /> <br />Hubbard and carried, the lowest and best bid of Triad Piping & Construction Co. was <br /> <br />Bid acceptance <br />Install traffic signals <br />intersections Warner Ave. <br />and Flower St., Fairview <br />St. and McFadden Ave., <br />and 17th and Berrydale <br />Sts., Project T-1 <br /> <br />accepted in the total amount of $84~220.00, and all other bids rejected. <br /> <br />A tabulation of bids was presented for the installation of traffic signal and light- <br /> <br />ing systems at the intersections of Warner Avenue and Flower Street, Fairview <br /> <br />Street and McFadden Avenue, and Seventeenth and Berrydale Streets, Project T-l, as <br /> <br />follows: <br /> <br />Steiny and Mitchel, Inc. <br />Ed Seymour <br />E. D. Johnnon & CO. <br />Paul Gardner Corp. <br />Allen Engineering Co. <br /> <br /> Total Bid Bond <br /> <br />36, 7~2.00 <br />35,825.00 lO~ <br />35,~87.oo lo% <br />32,83~.oo <br /> <br />On recc~mendation of the Manager, and on motion of Councilman Hubbard, seconded by <br /> <br />Schlueter and carried, the lowest and best bid of Allen Engineering Co. was accepte~ <br /> <br />at the unit prices and in the total amount of $32,834.00, and all other bids re- <br /> <br />Bid acceptance <br />Construct M-1 Storm <br />Drain btn intersection <br />FairMiew and Eighth Sts. <br />and the Santa Ana River, <br />Project D-~O <br /> <br />Jected. <br /> <br />A tabulation of bids was presented for the construction of the M-1 Storm Drain be- <br /> <br />tween the intersection of Eighth and Fairview Streets and the Santa Ana River, Pro- <br /> <br />Ject D-40, as follows: <br /> <br />Warner Construction Corp. <br />Knutson Construction Co., Inc. <br />Ralph deLeon Construction, Inc. <br />A. H. Famularo <br />Guho Corp. <br />Staler, Inc. <br /> <br /> Total Bid Bond <br /> <br />28, 3~. O0 10% <br />31, ~62.oo lO~ <br />2~, 326.6h 10~ <br />33,720.20 10% <br />52, ~. 5o z~ <br /> <br /> <br />