Council Chamber
<br />Santa Ana City Hall
<br />June 4, 1962 7:30 P.M.
<br />
<br />City Council met in regular session.
<br />Meeting called to order by the Mayor.
<br />
<br />Present:
<br />
<br />Councilmen Royal E. Hubbard, Henry H. Schlueter,
<br /> Bob Brewer, A. A. Hall
<br />
<br />Absent: Councilmen Dale H. Hein].v
<br />
<br />The Pledge of Allegiance w~s given.
<br />
<br />Invocation was given by Ralph Worsham, The Register.
<br />
<br />Each member of the City Council having received copies of the Minutes of
<br />May 18 and May 21, 1962, reading of the Minutes was dispensed with and
<br />approved as mailed, on motion of Counc~ lm~u .Hubbard, seconded by Brewer
<br />and carried.
<br />
<br /> A tabulation of $ids was presented for construction of additions to the Bristol
<br />
<br />Bid acceptance
<br />Construct additions
<br />to Bristol Street
<br />Booster Pumping
<br />Stat ion
<br />
<br />Street Booster Pumping Station, as follows:
<br />
<br />Ecco
<br />Hydro Construction Co.
<br />Rosecrans Construction Co.
<br />Triad Piping & Construction Co.
<br />Pylon, Inc.
<br />
<br />Total Bid Bond
<br />$~23,435.oo
<br />92, 76~. O0 10~
<br />90,374.00 10~
<br />8~, 22o.oo
<br />zo7, o3~.oo
<br />
<br />On rec~endation of the Manager, and on motion of Councilman Brewer, seconded by
<br />
<br />Hubbard and carried, the lowest and best bid of Triad Piping & Construction Co. was
<br />
<br />Bid acceptance
<br />Install traffic signals
<br />intersections Warner Ave.
<br />and Flower St., Fairview
<br />St. and McFadden Ave.,
<br />and 17th and Berrydale
<br />Sts., Project T-1
<br />
<br />accepted in the total amount of $84~220.00, and all other bids rejected.
<br />
<br />A tabulation of bids was presented for the installation of traffic signal and light-
<br />
<br />ing systems at the intersections of Warner Avenue and Flower Street, Fairview
<br />
<br />Street and McFadden Avenue, and Seventeenth and Berrydale Streets, Project T-l, as
<br />
<br />follows:
<br />
<br />Steiny and Mitchel, Inc.
<br />Ed Seymour
<br />E. D. Johnnon & CO.
<br />Paul Gardner Corp.
<br />Allen Engineering Co.
<br />
<br /> Total Bid Bond
<br />
<br />36, 7~2.00
<br />35,825.00 lO~
<br />35,~87.oo lo%
<br />32,83~.oo
<br />
<br />On recc~mendation of the Manager, and on motion of Councilman Hubbard, seconded by
<br />
<br />Schlueter and carried, the lowest and best bid of Allen Engineering Co. was accepte~
<br />
<br />at the unit prices and in the total amount of $32,834.00, and all other bids re-
<br />
<br />Bid acceptance
<br />Construct M-1 Storm
<br />Drain btn intersection
<br />FairMiew and Eighth Sts.
<br />and the Santa Ana River,
<br />Project D-~O
<br />
<br />Jected.
<br />
<br />A tabulation of bids was presented for the construction of the M-1 Storm Drain be-
<br />
<br />tween the intersection of Eighth and Fairview Streets and the Santa Ana River, Pro-
<br />
<br />Ject D-40, as follows:
<br />
<br />Warner Construction Corp.
<br />Knutson Construction Co., Inc.
<br />Ralph deLeon Construction, Inc.
<br />A. H. Famularo
<br />Guho Corp.
<br />Staler, Inc.
<br />
<br /> Total Bid Bond
<br />
<br />28, 3~. O0 10%
<br />31, ~62.oo lO~
<br />2~, 326.6h 10~
<br />33,720.20 10%
<br />52, ~. 5o z~
<br />
<br />
<br />
|