Laserfiche WebLink
347 <br /> <br />WATER RESOURCES <br /> <br />SURFACE WATER <br /> <br />22. (1) <br /> <br />The applicant shall upgrade or add catch basins and storm drain pipes in conjunction <br />with roadway improvements (exact size and location to be determined). <br /> <br />Timing of Implementation <br /> <br />After street improvement and <br />surface drainage plan check <br />approval <br /> <br />Method of Verification <br /> <br />Field inspection <br /> <br />Resnonsible Parties <br /> <br />Inspection Services Manager, <br />Building Division; and <br />Engineering Services Manager, <br />Development Engineering <br />Division <br /> <br />(2) <br /> <br />The applicant shall coordinate development of the project with the Owens Drive <br />realignment construction and utility relocation, including verification of the location of <br />the jet fuel line, sewer, water, and other utilities within Owens Drive. <br /> <br />Timing of Implementation <br /> <br />Prior to grading permit issuance; <br />during construction and roadway <br />improvements <br /> <br />Method of Verification <br /> <br />Grading plan check and field <br />inspection <br /> <br />Responsible Parties <br /> <br />Inspection Services Manager, <br />Building Division; and <br />Engineering Services Manager, <br />Development Engineering <br />Division <br /> <br />]B3/S:11340001 .MM A-I I <br /> <br /> <br />