My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-036 - Environmental Impact Report for the Main Street Concourse Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-036 - Environmental Impact Report for the Main Street Concourse Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:17 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-36
Date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
351 <br /> <br />NOISE <br /> <br />Short-Term Construction Noise Impacts <br /> <br />29. (1) <br /> <br />Hours of construction operation shall comply with .the City of Santa Aha Noise <br />Ordinance limiting construction between the hours of 7 a.m. and 8 p.m. on any <br />weekday, including Saturday. Construction activities (except for those occurring in <br />connection with emergency situations) are prohibited at any other time. Special <br />conditions to allow the fast-track, possibly 24-hour/7-day construction schedule for the <br />realignment of Owens Drive shall be stipulated as a condition of approval. <br /> <br />Timing of Implementation <br /> <br />Prior to grading permit issuance; <br />during construction; posting of <br />complaint hotline number to field <br />office <br /> <br />Method of Verification <br /> <br />Field inspection <br /> <br />Responsible Parties <br /> <br />Engineering Services Manager; <br />Development Engineer; <br />Environmental Coordinator, <br />Planning Division <br /> <br />30. (2) <br /> <br />All construction equipment, fixed or mobile, shall be equipped with properly operating <br />and maintained mufflers. <br /> <br />Timing of Implementation <br /> <br />Prior to grading permit issuance; <br />monthly inspection <br /> <br />Method of Verification <br /> <br />Grading plan check; written <br />verification provided by the <br />applicant; and field inspection <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, and <br />Supervisor of Inspections, <br />Building Division <br /> <br />JB3/S:i1340OOl.MM A-I5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.