My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-036 - Environmental Impact Report for the Main Street Concourse Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-036 - Environmental Impact Report for the Main Street Concourse Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:17 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-36
Date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31. (3) <br /> <br />32. (4) <br /> <br />Exterior Noise <br /> <br />33. (5) <br /> <br />Prior to construction of the Phase II residential tower, a 10-foot high construction <br />barrier wall shall he constructed around the construction area of the residential tower <br />on all sides facing occupied residences in order to minimize noise intrusion into the <br />Phase I housing units. The construction barrier wall shall have a closed surface free <br />from large cracks or gaps (all joints will be sealed). The wall will consist of 2" x 6" <br />wood framing with a 3/4" plywood surface. <br /> <br />Timing of ImplementatiQn <br /> <br />Prior to Phase II grading/ <br />construction permit issuance; <br />verification of completion; <br />monthly inspection <br /> <br />Method of Verification <br /> <br />Grading plan check; written <br />verification provided by the <br />applicant; and field inspection <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, <br />Planning Division <br /> <br />Excavation haul routes and hauling operations shall be selected and carried out to avoid <br />the intersection of Lawson Way and Owens Drive and to comply with the Noise <br />Ordinance of the City. (See MMP No. 3e and 13) <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to grading permit issuance <br /> <br />Method of Verification <br /> <br />Grading plan check and field <br />inspection <br /> <br />Responsible Parties <br /> <br />Engineering Services Manager, <br />Development Engineering <br />Division; and Environmental <br />Coordinator, Planning Division <br /> <br />Stationary construction equipment shall be placed such that emitted noise is directed <br />away from residential land uses. <br /> <br />Timing of Implementation <br /> <br />Prior to building permit issuance; <br />monthly verification inspection <br /> <br />Method of Verification <br /> <br />Grading plan check; written <br />verification provided by the <br />applicant; and field inspection <br /> <br />Responsible Parties <br /> <br />Inspection Services Manager, <br />Building Division; and <br />Environmental Coordinator, <br />Planning Division <br /> <br />m3/s:~ ~3400O~.MM A-16 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.