Laserfiche WebLink
353 <br /> <br />34. (6) <br /> <br />35. (7) <br /> <br />36. (8) <br /> <br />The California State Noi~ .,sulation Standards and the City of Santa Ana require that <br />the interior noise levels for residential land uses be no greater than 65 CNEL. At the <br />time of building permit application, the architectural and site plans shall be reviewed <br />to ensure that the interior noise levels do not exceed 45 CNEL. <br /> <br />Timin~ of Imnlementation/Verification <br /> <br />Prior to issuance of building <br />permit <br /> <br />Method of Verification <br /> <br />Architectural plans check and <br />field inspection <br /> <br />Responsible Parties <br /> <br />Senior Plan Check Engineer, <br />Building Division; Case Planner, <br />and Environmental Coordinator, <br />Planning Division <br /> <br />During the construction of Phase [1, an evaluation of noise impacts on Phase I residents <br />shall be conducted by a certified acoustical engineer. Measurements shall occur at <br />least three times during the first six months of Phase II construction, with results <br />submitted to the City of Santa Aha for review (See MMP No. 31). Prior to sale/rental <br />of each phase I residential unit, residents shall read and sign a noise disclosure <br />statement to notify residents of potential Phase II construction noise. <br /> <br />Timing of Implementation/Verification <br /> <br />During Phase 11 construction <br /> <br />Method of Verification <br /> <br />Field inspection and written <br />verification from a certified <br />acoustical engineer <br /> <br />Responsible Parties <br /> <br />Certified acoustical engineer, <br />Case Planner, and Environmental <br />Coordinator, Planning Division <br /> <br />If pile-driving is used, a noise assessment shall be submitted to the City and approved <br />prior to initiation of grading or construction to the satisfaction of the City of Santa Aha <br />so as to minimize impacts. (See MMP Nos. 31, 35 and 37) <br /> <br />Timing of Implementation <br /> <br />Prior to grading permit issuance <br /> <br />Method of Verification <br /> <br />Grading plan check; written <br />verification provided by the <br />applicant; field inspection prior to <br />notification; and posting of <br />hotline phone number <br /> <br />Responsihle Parties <br /> <br />Environmental Coordinator, <br />Planning Division, or Certified <br />Acot,stical Engineer <br /> <br />Je3/s: 11340001 .MM A-17 <br /> <br /> <br />