My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-046
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2014 9:11:51 AM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-46
Date
5/3/1993
Document Relationships
90-088
(Repeals)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1990
95-022
(Repealed By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
510 <br /> <br />RESOLUTION NO. 93-046 <br />PAGE 12 <br /> <br />24) <br /> <br />Inspections for which no fee is <br />specifically indicated (minimum <br />charge - one (1) hour) <br /> <br />$50.00 per hour <br /> <br />25) <br /> <br />Additional plan review required <br />by changes, additions, or revisions <br />to approved plans (minimum charge - <br />one (1) hour) <br /> <br />$50.00 per hour <br /> <br />ELECTRICAL PLAN CHECK FEES <br /> <br /> Whenever electrical plans are required by the Building <br />official, plan check fees shall be sixty-five percent (65%) of <br />the electrical permit fee and shall be paid at the time of <br />submitting plans. <br /> <br />IV. <br /> <br />MECHANICAL CODE <br /> <br /> Any person desiring a permit required by the Mechanical <br />Code shall, at the time of filing an application therefor, pay <br />a fee equal to $17.00 plus the sum of the fees for the work to <br />be done under the permit as set forth in the following schedule, <br />provided, however, that the minimum fee for the issuance of any <br />permit shall be forty dollars ($40.00). <br /> <br />~ote: A mechanical Code permit fee is separate from and <br />additional to the fee for any other permit which may be required <br />by Code provisions other than the Mechanical Code.) <br /> <br />FEE SCHEDULE <br /> <br />1) <br /> <br />For the installation or relocation <br />of each forced-air or gravity-type <br />furnace or burner, including ducts <br />and vents attached to such appliance, <br />up to and including 100,000 BTU/h <br /> <br />$18.00 <br /> <br />2) <br /> <br />For the installation or relocation <br />of each forced-air or gravity-type <br />furnace or burner, including ducts <br />and vents attached to such appliance <br />over 100,000 BTU/h <br /> <br />$25.00 <br /> <br />3) <br /> <br />For the installation or relocation of <br />each boiler, compressor, condensing <br />unit or heat pump up to and including five <br />horsepower, or each absorbtion system to <br />and including 100,000 BTUH <br /> <br />$30.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.