Laserfiche WebLink
RESOLUTION NO. 93-046 <br />PAGE 23 <br /> <br />7) <br /> <br />8) <br /> <br />9) <br /> <br />10) <br /> <br />11) <br /> <br />13) <br /> <br />14) <br /> <br />Water piping replacement, <br />each 100 feet <br /> <br />Gas piping service, 1-5 outlets . <br /> <br />Backflow prevention device <br /> <br />For each appliance or piece-of equipment <br />regulated by this Code for which no fee <br />is listed <br /> <br />Inspections outside of normal <br />business hours (4 hour minimum charge <br />for Holidays, Saturday and Sunday <br />inspections) <br /> <br />Re-inspection fee assessed under <br />provisions of Section 305(g), <br />Uniform Building Code <br /> <br />Inspections for which no fee is <br />specifically indicated (minimum <br />charge - one (1) hour) <br /> <br />Additional plan review required <br />by changes, additions, or revisions <br />to approved plan (minimum charge - <br />one (1) hour) <br /> <br />$12.00 <br />$12.00 <br /> <br /> $6.00 <br /> <br />$6.00 <br /> <br />$50.00 per hour <br /> <br />$50.00 per hour <br /> <br />$50.00 per hour <br /> <br />$50.00 per hou <br /> <br />SOLAR PLAN CHECK FEES <br /> <br /> Whenever solar plans are required by the Building Official, <br />plan check fees shall be sixty-five percent (65%) of the solar <br />permit fee and shall be paid at the time of submitting plans. <br /> <br /> <br />