Laserfiche WebLink
355 <br /> <br /> Table 1 <br />Mitigation MonitOring Program .Activities <br /> <br /> Mitigation Measure <br />~i~d U~o~ a~d Bu~inea~ Relocation <br /> <br />Tlmin$ of <br />Implementation <br /> <br />5-! Prior to beginning conscmctlon, the City shall comply with the California <br /> Uniform Relocation Ass/stance and Real Property Acquisition Polities Act <br /> (Go~ernment Code Section 7260 et. seq.). This Act requires that <br /> public enrltie~ in California provide juat compensation (fa/r market value) <br /> and relocation advisory ass/stance t~a any per, on or business displaced <br /> because of the acquisition of real property for public uae~. Relocat/on <br /> advi~a~/aerrice~ and reiocat/on payments shall be prov/ded to eligible <br /> redp/enm, consistent w/th th/s Act. A relocation advisor shall contact <br /> each business and resident required to celocate to prov/de additional <br /> information, sub~-quent to a dec/s/on on the proiect. <br /> <br /> Relocat/on r~outxTga shall be made av'a/Labie by the City co all residential <br /> and buslne~ relocatee$ without discrimination during the fight.of, way <br /> acquiaition procea$. <br /> <br />5-2 Sub~quent to project approvat, the Planning Department, Public Works <br /> Agency and Redevelopment Agency shall coordinate development of final <br /> st~t improvement plans, to ensure that project impleraentation and the <br /> ultimate use of remnant parce~ are consistent with appropriate City <br /> polld~, t~,ulations and redevelopment plan strategiea. <br /> <br />Pr/or to <br /> <br />Sui~xtuent to project <br />approval and prior to <br />con$~ructiori <br /> <br />7-1 <br /> <br />A pt~iimin~T ske investigation (PSI) will be conducted for any sites <br />whex~ hazludous waste/materials are encountered during construction. A <br />Phase II site assessment, including testing, will determine the extent and <br />type of contaminants in~at~xt, and the remediafion procedures, if <br />quired. Any neces~ry remediation action to properly dispose of toxic <br />wa.~e mamria~ wilJt be in compliance with County, State and Federal <br />Poilcies and Procedures. <br /> <br />As needed during <br />construction. [Note <br />to be shown in <br />specifications) <br /> <br />7-2 <br /> <br />If unkno,~l wasted~naterials or an underground tank that the contractor <br />believes may invotv~ h,~'ardous wasteJmateriai~ are discovered during <br />construction, the contractor shall: <br /> <br />1. Immediately stop work in the viciniw of the suspected contaminant, <br /> rerao~ worker~ and ~he public from the area; <br /> <br />A~ needed during <br />construction. [Note <br />to be shown in <br />spedfications) <br /> <br />2. Notify the Project Engineer; <br /> <br />3. Secure the area, as directed by the Project Engineer; and <br /> <br />The proponent sh~ll follow procedures for site assessment, initiate coot. <br />dination with County, State, and regulatory agencies as required, and take <br />remedial action as appropriate. <br /> <br />Responaible <br />Agency/ <br />Organization <br /> <br />EC <br /> PD <br />CDA <br /> <br /> EC <br />PWA <br /> PD <br /> <br /> EC <br />PWA <br />SAFD <br /> <br /> EC <br />PWA <br />SAFD <br /> <br /> <br />