My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
95-018 - Retention Schedule for the Agencies, Departments, and Offices
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1995
>
95-018 - Retention Schedule for the Agencies, Departments, and Offices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2015 12:08:55 PM
Creation date
6/26/2003 10:47:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
95-18
Date
6/19/1995
Document Relationships
94-048 - Establishing a Records Retention Schedule for the Agencies Departments and Offices
(Repeals)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1994
96-088 - Approving the Destruction of Records in Accordance Therewith
(Amended By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Records Retention Schedule <br /> <br />PUBLIC WORKS AGENCY <br /> <br />Resolution 95-018 <br /> Page L-2 of L-7 <br /> <br /> RECORD RECORD RECORD RETENTION RETENTION REMARKS <br /> CATEGORY SERIES DESCRIPTION START DATE PERIOD <br /> <br />DESIGN Soils Reports Detailed soil analysis/construction Report Date 10 yrs Project design data <br />ENGINEERING recommendations <br /> <br />DEVELOPMENT Certificates of Compliance City Engr. Approval of existing subdivision Date Recorded Indefinitely Reference copies <br />ENGINEERING <br /> <br /> City Map (Official) Amended every three years Until Indefinitely Official City Record <br /> Superseded <br /> <br /> Development Conditions Public Works Private Development SEE BLDG. Orig. Bldg. Reference Copies <br /> Conditions <br /> <br /> Special Studies Re: Transportation Issues re: Joint Powers Date Until Reference <br /> Authorities, etc, Completed Superseded <br /> <br /> Street Permits Street work, surface drainage, wide load, Completion Date 5 yrs Public Works copy <br /> water appl, fire hydrant, utilities <br /> (Incl. Ins. Certs./Bonds) Expiration Date 2 yrs To insure compliance <br /> <br />DRAWINGS Project Plans/Drawings Project Drawings in Central Files Date signed Until Original mylars, etc. <br /> Superseded <br /> <br />MAINTENANCE Driver Equipment Motor Carrier Safety requirements Date Issued 10 yrs State requirement <br /> Certification <br /> <br /> Field Work Records Supen/isor's Crew Work records Date of Work 2 yrs Reference Data <br /> Graffiti Removal Locations/sq.ft. of Graffiti removed Date of Work 2 Yrs Reference Data <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.