Laserfiche WebLink
from the State Water <br />Resources Control Board for <br />National Pollution <br />Discharge Elimination <br />System (NPDES) General <br />Permit for storm water <br />discharges associated with <br />construction activity. <br /> <br />[ <br /> <br />4. A drainage analysis <br />shall be prepared for <br />individual projects to <br />determine the impact of <br />additional runoff on <br />external storm drains in <br />the area. Required <br />upgrades to storm drain <br />lines shall be implemented <br />as part of the project <br />construction. <br /> <br />Prior to the issuance <br />of grading permits. <br /> <br />5. In areas where storm <br />drain facilities are not <br />available, the Agency shall <br />provide the necessary <br />infrastructure in <br />accordance with the <br />requirements of the County <br />and City prior to project <br />construction. <br /> <br />Prior to the issuance <br />of grading or building <br />permits. <br /> <br />6. Future drainage <br />improvement projects shall <br />be made in accordance wit~ <br />the City's Master Plan of <br />Drainage. Drainage <br />projects would be <br />coordinated with the County <br />of Orange Department of <br />Public Works and their <br />projects in the area. <br /> <br />Prior to the issuance. <br />of grading or building <br />permits. <br /> <br />~ltural Resouroas= <br /> <br />1. A cultural resource Prior to project <br />survey shall be conducted approval. <br />for sites that are vacant <br />and previously undeveloped. <br />Should a records search <br />indicate the past presence <br />of cultural artifacts on <br />the site a walk-over of the <br /> <br />6 <br /> <br /> EC <br />PWA <br /> BD <br /> <br /> EC <br />PWA <br /> <br /> EC <br />PWA <br /> <br />EC <br />PD <br /> <br /> <br />