Laserfiche WebLink
RESOLUTION 95-024 <br /> <br />[ <br />L <br />[ <br />[ <br />[ <br /> <br />[ <br /> <br />Traffic and ~irculation: <br /> <br />1. When feasible, all <br />Agency sponsored public <br />work projects shall be <br />constructed when there is <br />minimal potential for <br />construction traffic <br />impacts on roadways in the <br />immediate vicinity of the <br />project. <br /> <br />2. Traffic studies shall <br />be prepared for all <br />applicable projects in <br />compliance with the City's <br />Congestion Management <br />Program and Measure "M". <br /> <br />3. The City shall require <br />all feasible trip reduction <br />measures per the City of <br />Santa Ana Transportation <br />Demand Management (TDM) <br />Ordinance No. NS-2124 be <br />incorporated into <br />development projects. <br /> <br />4. The Agency shall <br />monitor identified needed <br />City traffic and <br />circulation improvements <br />within the Project Area and <br />assist the City when <br />revenues become available <br />in constructing thos~ <br />needed improvements. <br /> <br />5.. Traffic and roadway <br />improvements shall follow <br />the roadway standards in <br />the Circulation Element. <br />This includes projects <br />dealing with public <br />transit, scenic roadways, <br />bicycle, equestrian and <br />hiking trails, and <br />pedestrian routes. <br /> <br />After street <br />improvement plan <br />checks. <br /> <br />Prior to project <br />approval or the <br />issuance of building <br />permits. <br /> <br />Prior to the issuance <br />of building permits. <br /> <br />On-going program. <br /> <br />On-going program. <br /> <br /> EC <br />PWA <br /> <br /> EC <br />PWA <br /> PD <br /> <br /> EC <br />PWA <br /> <br /> EC <br />PWA <br /> <br /> EC <br />PWA <br /> <br /> <br />