My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
95-024
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1995
>
95-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:48 PM
Creation date
6/26/2003 10:47:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
95-24
Date
6/20/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
859 <br /> <br />Air 9uality~ <br /> <br />1. Bus turnouts should be <br />provided at all bus stop <br />locations throughout the <br />Project Area when possible. <br /> <br />2. Ail passenger waiting <br />areas should be improved <br />with a bus shelter and <br />bench when possible. <br /> <br />3. Paved, well-lighted <br />handicap accessible <br />accessways shall be <br />provided between the bus <br />stop and adjacent buildings <br />when possible. <br /> <br />4. All bus stop areas <br />shall have adequate <br />pavement thickness to <br />support buses where <br />possible and when feasible. <br /> <br />5. The city should <br />maintain existing <br />pedestrian and bicycle <br />systems to promote non- <br />motorized transportation <br />consistent with the City's <br />Circulation Element of the <br />General Plan. <br /> <br />6. Project construction <br />shall cease on days with a <br />Stage 2 or greater smog <br />alert. <br /> <br />7. The City shall <br />encourage the use of shade <br />trees whenever possible to <br />reduce building heating and <br />air conditioning <br />requirements. This measure <br />includes maintaining <br />existing mature trees in <br />the case of upgrading or <br />expanding an existing <br />building or planting mature <br />trees in conjunction with <br />new development. <br /> <br />After street <br />improvement plan <br />checks. <br /> <br />Prior to the issuance <br />of grading or building <br />permits. <br /> <br />Prior to the issuance <br />of grading or building <br />permits. <br /> <br />After street <br />improvement plan <br />check. <br /> <br />On-going program. <br /> <br />On-going program. <br /> <br />During site plan <br />review of individual <br />projects. <br /> <br />9 <br /> <br /> EC <br />PWA <br /> <br /> EC <br />PWA <br /> PD <br /> <br /> EC <br />PWA <br /> <br /> EC <br />PWA <br /> <br /> EC <br />PWA <br /> PD <br /> <br />EC <br />BD <br /> <br />EC <br />PD <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.