Laserfiche WebLink
RESOLUTION 95-060 <br /> <br />Agency and Public Works Agency will determine the need for a measure to be modified and <br />ensure the use of a' mitigation specialist if technical expertise beyond the monitor's ability is <br />required. If it is found that an adopted mitigation measure is not being properly implemented, <br />the designated monitors shall require corrective actions to ensure adequate implementation. <br /> <br />EARTH RESOURCES <br /> <br />To reduce run-offduring rainy periods, desiltation devices such as sandbags shall <br />be placed in areas of the project sites to eliminate discharge of soil laden waters <br />from the project sites onto other City streets or into storm drains. <br /> <br />-Responsible for Implementation: City of Santa Ana, Public Works Agency <br /> <br />-Monitoring Phases: <br /> <br />-Method of Monitoring: <br /> <br />-Monitoring Agency: <br /> <br />During construction <br /> <br />Site Inspections <br /> <br />City of Santa Ana Planning and Building Agency <br /> <br />Care will be taken during watering for dust control to ensure that silt laden water <br />does not runoff the project site onto other City streets or into storm drains. If the <br />temporary conditions during grading result in flows of water off the site, <br />desiltation devices shall be placed at the appropriate areas on the sites to eliminate <br />the discharge of soil laden waters off the project site. <br /> <br />-Responsible for Implementation: City of Santa Ana, Public Works Agency <br /> <br />-Monitoring Phases: <br /> <br />-Method of Monitoring: <br /> <br />-Monitoring Agency: <br />3. <br /> <br />During construction <br /> <br />Site Inspections <br /> <br />City of Santa Ana Planning and Building Agency <br /> <br />In order to reduce wind erosion of soils, fugitive dust from construction activities <br />shall be controlled by regular watering or other appropriate measure to comply <br />with the South Coast Air Quality Management District (SCAQMD) Rule 403. <br /> <br />-Responsible for Implementation: City of Santa Ana, Public Works Agency <br /> <br />-Monitoring Phases: <br /> <br />-Method of Monitoring: <br /> <br />-Monitoring Agency: <br />4. <br /> <br /> During construction <br /> <br /> Site Inspections <br /> <br /> City of Santa Ana Planning and Building Agency and City <br />During the period between grading and paving, the use of the graded and unpaved <br /> <br /> <br />