Laserfiche WebLink
~08. RESOLUTION 95-060 <br /> <br />areas by construction vehicles and other traffic shall be avoided if possible. <br />Where avoidance of these areas is not possible, measures shall include regular <br />watering, covering of driveway access ways and other similar measures to avoid <br />unnecessary dust generation. <br /> <br />-Responsible for Implementation: City of Santa Ana, Public Works Agency and <br /> construction foreman. <br /> <br />-Monitoring Phases: <br /> <br />During construction <br /> <br />-Method of Monitoring: Site inspections <br /> <br />-Monitoring Agency: <br /> <br />City of Santo Ana, Planning Division <br /> <br />AIR RESOURCES <br /> <br /> 5. Prior to street construction operations, a watering and sweeping program shall be <br /> designed and approved by the Executive Director of Public Works to minimize <br /> impacts of the haul operations. <br /> <br /> -Responsible for Implementation: City of Santa Aha, Public Works Agency <br /> <br />-Monitoring Phases: <br /> <br />-Method of Monltoring: <br /> <br />-Monitoring Agency: <br /> <br />During construction <br /> <br />Site Inspections <br /> <br />City of Santa Ana Public Works Agency <br /> <br />Prior to demolition of the apartments, homes and buildings, the presence of <br />ACBMs in the apartments will be verified by a certified contractor. If ACBMs <br />are found, all removal activities will be conducted in compliance with AQMD <br />Rule 1403: Asbestos Emissions from Demolition and Renovation Activities. <br /> <br />-Responsible for Implementation: Building Contractor and City Building Division <br /> <br />-Monitoring Phases: <br /> <br />Prior to construction <br /> <br />-Method of Monitoring: Site inspections <br /> <br />-Monitoring Agency: <br /> <br />City of Santa Ana Planning and Building Agency <br /> <br />Demolition and construction activities will be discontinued during first and second <br />stage smog alerts. <br /> <br /> <br />