My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
95-070
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1995
>
95-070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:54 PM
Creation date
6/26/2003 10:47:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
95-70
Date
11/6/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 95-070 <br /> <br />Amendment Application No. <br />October 16, 1995 <br />Page 2 of 3 <br /> <br />95-5 and Conditional Use Psrmit No. 95-20 <br /> <br />287 <br /> <br />Prior to issuance of a building permit, complete the <br />following: <br /> <br />1. Dedicate a 17' x 17' corner cut-off area at the <br /> southwest corner of Grand and Fairhaven Avenues. <br /> <br />Prior to the utilities release, complete the following: <br /> <br />1. Improve Grand Avenue as follows: <br /> <br />Remove and replace existing street pavement for <br />the existing curb lane matching to good edge of <br />existing pavement from southerly property line to <br />centerline of Fairhaven Avenue per approved <br />improvement plan. <br /> <br />Construct a 12' x 60' bus pad at the existing bus <br />stop location per approved improvement plan. <br /> <br />Co <br /> <br />Construct the two drive approaches per City <br />Standard #1112, Case 2, W=38', A=38', X=3' and <br />approved improvement plan. <br /> <br />Close existing drive approaches with full height <br />curb and full width sidewalk per City Standards <br />and approved improvement plan. <br /> <br />Underground the existing power poles per approved <br />improvement plan. <br /> <br />f. Install "NO STOPPING ANYTIME" zone. <br /> <br />Improve the southwest corner of Grand and Fairhaven <br />Avenues as follows: <br /> <br />Construct 12" grooving border in the new concrete <br />paving at the top of the existing wheelchair ramp <br />at the southwest corner of Grand and Fairhaven <br />Avenues per City standard #1122A and approved <br />improvement plan. <br /> <br />Construct concrete paving in the 17' x 17' corner <br />cut-off per City standards and approved <br />improvement plan. <br /> <br />3. Improve Fairhaven Street as follows: <br /> <br />close existing drive approach with full height <br />curb and full width sidewalk per City Standards <br />and approved improvement plans. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.