My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
96-100
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1996
>
96-100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:41 PM
Creation date
6/26/2003 10:47:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
96-100
Date
11/18/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
466 <br /> <br />Finding <br /> <br />Changes or alterations have been required in and incorporated into the project which <br />avoid the above significant effect. <br /> <br />Facts <br /> <br />Future contractors shah implement the following measures throughout construction <br />activities: <br /> <br />* Comply with Rules 401 - 403 of the SCAQMD to reduce onsite dust <br /> levels. <br /> <br /> Periodically apply water and dust superannuates to graded areas. <br /> Cover any hauling fill <br /> <br /> Operate street sweepers on adjacent roadways to remove dirt from <br /> construction vehicles or dried mud carried off by trucks. <br /> <br /> Stabilize disturbed areas if construction is delayed. <br /> <br /> Terminate soil disturbance when high winds (greater than 25 miles per <br /> hour) occur. <br /> <br /> Ensure that all construction equipment shall be maintained in proper <br /> working order. <br /> <br /> Wash construction vehicles each time upon entering public roadways to <br /> reduce dust levels. <br /> <br /> Require 90-day low NOx tune-ups for off-road equipment. <br /> <br /> Limit allowable idling to 10 minutes. No idling shall occur on streets <br /> adjacent to residential areas. <br /> <br /> Park construction vehicles off traveled roadways. <br /> <br /> Wash or sweep access points daily. <br /> <br /> Sandbag construction areas for erosion control as needed. <br /> <br /> Receive materials during non-peak traffic hours. <br /> <br /> Limit disturbance areas to five acres. <br /> <br /> Encourage car-pooling for construction workers. <br /> <br />FINDINGS OF FACT/MIDTOWN DISTRICT SPECIFIC PLAN/EIR NO. 94-1 15 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.