Laserfiche WebLink
07O <br /> <br />depending on the magnitude of the event. <br /> <br />Finding <br /> <br />Finding 1: <br /> <br />Changes or alterations have been required in, or incorporated into, the project which <br />avoid or substantially lessen the significant environmental effect identified in the <br />Final EIR. <br /> <br />Facts in Support of Findings <br />Any potential impacts associated with groundshaking will be mitigated to a less than significant <br />level through implementation of the following mitigation measure: <br /> <br />All structures shall be designed in accordance with the current Uniform Building Code and <br />the seismic design parameters of the Structural Engineers Association of California and to <br />meet the requirements of the City. <br /> <br />Significant Effect <br /> <br />The proposed Project site may potentially be subjected to impacts resulting from liquefaction. <br /> <br />Finding <br /> <br />Finding !: <br /> <br />Changes or alterations have been required in, or incorporated into, the project which <br />avoid or substantially lessen the significant environmental effect identified in the <br />Final EIR. <br /> <br />Facts in Support of the Findino <br />The proposed Project area is identified in the City's General Plan as having low potential for <br />liquelhction, ttowever, no geotechnical evaluations have been conducted for the subject site, it is <br />not possible to determine the potential for, or extent of liquefaction in the area. Potential impacts <br />will be reduced to a less than significant level through implementation of the following mitigation <br />measure: <br /> <br />The site shall be evaluated by a geotechnical engineer and all structures should be subject <br />to specific structural review for potential damage from liquefaction. Measures identified to <br />safeguard against damage shall be incorporated into project design. <br /> <br />}V.d TER RESOURCES <br /> <br />Significant Effect <br /> <br />The development of the multMevel parking structure in Phase II will be developed on a parcel that <br />is in the 100-year floodplain of Santiago Creek, as designated by the Federal Emergency <br />Management Agency (FEMA). Developments in the 100-year floodplain have the potential to <br /> <br />Discovery Science Ce,tcr EIR Jpril I0. 1997 <br />City of .¥anta .4ha 6 Stateme,t qf Findings altd Facts <br /> <br /> <br />