Laserfiche WebLink
089 <br /> <br />MITIGATION MONITORING PLAN IMPLEMENTATION <br /> <br /> In the following MMP, each mitigation measure included in the EIR is listed by resource <br />area. Implementation of most mitigation measures in this plan is the responsibility of the Discovery <br />Science Center, with oversight and verification by the City. <br /> <br /> Certain inspections arid reports require preparation by qualified individuals, and these are <br />specified as needed. The timing and method of verification are provided within this plan, along with <br />the parties responsible for implementation and monitoring of the mitigation measure to determine <br />whether the measure has been satisfactorily implemented. Satisfactory implementation of a <br />mitigation measure is to be indicated through the use of the compliance verification form, which <br />must be signed by the responsible party(s) upon completion. <br /> <br /> <br />