Laserfiche WebLink
MITIGATION MONITORING AND REPORTING PLAN FOR THE EIR FOR THE DEVELOPMENT OF THE <br /> DISCOVERY SCIENCE CENTER IN THE CITY OF SANTA ANA <br /> <br /> Mitigation Measures Timing of Implementation/ Method of Verification <br /> Verifieation Responsible Parties <br />GEOLOGY <br /> <br />1, Thc site shall be evalua~l by a gnotechnical cngineer and all Prior to appwval of building permits; Buildingpinnchcck Senior Plan Check Engineer, Building Division; <br />structures shall be subject to tevinw and approval by a ~'u~ural during construction phase Engineering Services Manager, Development <br />engineer prior to construction. Measures to safeguard against Engineering Division <br />damage riom subsidence shall be incorpomed into project design. <br />Thc existing onsi~e smictu~ shall be upgraded in its seismic d~ign <br />to conform lo current building codes. <br />2. Typical dust-suppressinn methods, such as watering durin On-going during g~giing and Field inspection during grading and Environmental Coordinator, Planning Division; <br />grading activities lo minimize fugitive dust, shall be practiced, construction consLructinn Inspection Scrvicns Supervisor, Building Bivision; <br /> Project Contractor <br />3. All sUuctorcs shall be designed in accordance with thc curreet Prior to approval of building permits; Building plan check, field inspection Senior Plan Check Engineer, Inspection Services <br />Uniform Building Code, the seismic design parameters of the during cons~rocfion phesc Manager, Building Division <br />Structural Engineers Azsouiafion of Califonfia and City <br />requirements. <br />4. Thc site shall be evalua~d by a geotechnical anglneer and all Prior to approval of building permits; Building plan check Senior Plan Check Engineer, Building Division; <br />s~ruetures should be subjuet to specific slructural review for during construction phs.se Engineering Service~ Manager, Developrocnt <br />potential damagn from liquefaction. Mgasures identified to Engineering Division <br />safeguard against damage shall be incotperaled into project design. <br />WATER RESOURCES <br />1. Thc project shall be designed according to applicable City of Prior to approval of building permits Building plan check Senior Plan Check Engineer, Building Division <br />Santa Aha and FEMA requirements and guidelines to ensu~ that <br />the pmtdnE stmctmc, vchicolar loridgc, and rala~d components will <br />not impede or otherwise altor siorm flows. <br />2. Thc project app[inant shall comply with lhe Smtewide NPDES Prior to issuance of grading permits Surface drainage and grading plan check Regional Water Quality Control Board; Engineering <br />Construction Permit by preparing a Stormwater Pollution Services Manager, DcvetopmentEngiuecring Division; <br />Prevention Plan (SWPPP), and~c Countywide Municipal NPDES Water Resources Manager, Water Resources Division; <br />permit by prcpming a sepanUe Water Quality Management ProjectAppllcant <br />(WQMP). Prior to the issuance of a building permit, thc applicant <br />shall submit to the City thc SWPPP and WQMP which will both <br />identify the specific BMPs that will be implcnted to control <br />pollutants in site runoff. <br /> <br />4 <br /> <br /> <br />