My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
97-017
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1997
>
97-017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:18 PM
Creation date
6/26/2003 10:47:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
97-17
Date
4/21/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Measure~ <br /> <br />4. 'mc applicant, in coordination with the City and Caimans, shall <br />constsuct a sound wall hetwenn thc parking lot and Santa Aaa <br />f~woy. The wall shall he high enough to block the line of sight <br />between the average height of the high stack exhaust cfa heavy <br />U~ck and average ear heighL 'me sound wall shall be constructed <br />with a material with a density of at It~L~t 4 pounds per sf, preferably <br />concrete or concrete block. <br /> <br />Timing of Implementation/ <br /> Verification <br /> <br />Plan dleck, prior to isso~co of building <br />pennR (note on plato) and CeftL~cate of <br />Occup~cy issuance <br /> <br /> Method of Verification <br />Building plan check; final inspection <br /> <br /> Responsible Parties <br /> <br />Environmental Coordinator, Case Planner, Planning <br />Division; Inspection Services Manager, Building <br />Division; Caluans Project Manager; Project Contractor <br /> <br />PUBLIC SERVICES <br /> <br /> Plan check review, field inspection <br /> <br />I. Should the Police IX-partmmt determin~ that due to security <br />concerns fencing between the bike trail and the parking lot on th, <br />3.5-acre site is nccnssa~7, then appropriate fencing shall be <br />installed. <br /> <br />UTILITIF. S <br /> <br />Plan check; prior to issuance of <br />Cerflfieag of Occupan~ <br /> <br />Case Planner, Planning Division; Community Services <br />Specialist, Police D~:partmem; Operations Manager, <br />Recreation and Community Services Agency; Project <br />Applicant <br /> <br />1. Any installation of new alcctriosl cable th~ would disrupt traffic <br />shall occur during off-penk hours or at night. <br /> <br />Prior to issuance of appropriate permits <br />or approvals <br /> <br />Plan check; field ivspections <br /> <br />Senior Plan Check Engineer, Building Division; Police <br />Department; Public Works Agency; Project Applicant; <br />Southern California Edison <br /> <br />2. Prior to utility release, thc Public Works Agency shall fund the Prior to utility rele, us~ and issuance of Plan check; final inspection Eaginetdag Services Manager, l~vclopment <br />abandonment of the water llne in Amen Drive. C~Rificate of Occupancy Engineering Division, Public Works Agency <br /> <br />3. 'me City will require utilization of the following water Building plan check (note on plans); Plan check, final inspection Senior Plan Check Engineer, Building Division; Water <br />conservation techniques: prior to CctriBna~ of Occupan~y; and Resources Manager, Public Works Agency; Project <br />- Water conserving featur~ including plumbing fcxtures, ultsa-low throughout the life of the projant Applicant <br />flush toilets, and dish washers shall be installed. <br />- Irrigation features shall include drought-tolerant plants grouped <br />according to water r~quirements and efficient, time to minimize <br />run-off and evaporation. <br /> <br />HAZARDS <br /> <br /> Duringoperafionoftheproj¢ct Fire Marshal, Fire Prevention Division; Communil <br /> Services Specialist, Police Department <br /> <br />1. All hazardous materials shall b~ strictly conUollcd and stored <br />according to requirements of the City of Santa Ana Fire <br />Department. Uses shall be restricted to k:aching purposes only. <br /> <br />Iln.~ction <br /> <br />CULTURAL RESOURCES <br /> <br />~fr~urce~ar~unc~v~redduringconsu~cti~n~w~rkmusthalt~Duringgradingandsitepreparati~n~Peri~dicinspe~ti~nduringgradingand Environmental Coordinator, Planning Division; <br />and a qualified archaeologist most assess thc significance of the activities in the construction phase of construction, and monitoring by project Inspection Services Manager, Building Division; Project <br />resource, and what, if any, measures are necessary to mitigatelithe project contractor applicant and/or contractor; qualified archaeologist as <br /> <br />7 <br /> <br />c~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.