Laserfiche WebLink
Mitigation Measures Timing of Implementation/ Method of Verification <br /> Verification Responsible Parties <br />$. ThcapplicantthallinatallaUafficsigonlatthcintcvicofionof Prior to issuance of Certificate of Finallnspection Engineering Services Manager, Development <br />thc project driveway and Main Strut, and ruslripe the pmjcot Occupancy for Phone H Engineering Division; City Council; Project Applicant <br />entrance to one lane in and two inne-s out. <br />6, During Phase I operation' the applicant shall secu~ Condiilonofappwval, prinrto issuance WriRen agreement belwean project Engim:oring Services Manager, D~v¢inpment <br />arrang~rmmts for bus layover parking for buses at tho of C~rilfic. ale of Occupancy; on-going applic.~t and tho Redevelopment Agency Engineering Division; City Council; Project Applicant; <br />Redevelopment Agency ovngd lot on the cOmer of S~tingo and dusing life of project to be pwvid~d in the Development Redevelopment Division <br />Santa Ann Boui~verd. Ag~em~nt <br />7. During Phase B operation, the applicant shall secu~ Condifianofapproval, pfiorto issuance wrinan agreement between project Engineering Services Manager, Development <br />arrangements for bus layover parking for buses at the of C.~-rfificete of Occupancy; on-going applicant and the Regional Transpooation Engineering Division; City Council; Project Applicant; <br />Redevelopment Agency owned lot on tho COmer of Santiago and during life of pwjeat C. eater to be provided in the Development Redevoinpraent Division <br />Sanu~ Aha Boulevard. Agreement <br />g. If an altemaive offaltc lot for bus paddng is nan~sory in Pbaan Prior to issuance of a building permit; Management plan shall be submitted to thc Engineering Services Manager, Development <br />IL thc incmion of thc int must be mataliy ag~ceebin to the applicant ongoing during life of project Planning Division and Public Works Engineering Division, Public Works Agency; Case <br />and Re~vclopment Agency. Agoncy for approval prior to issuance of Planner, Planning Division; Project Applicant <br /> any permits <br />9. Prior so the issuance of a building permit, thc applicant shall Prior to issuance of a Cenificute of Managcatem plan shall be submitted to thc Enginccriag Services Manager, Development <br />mbmit a bus parking management plan. Tbe applicam shall Occupany; on-going during life of Planning Division and Public Works Engineering Division, Public Works Agency; Case <br />develop a parking plan in coordination with their expec~d large project Agency for approval prior to issuance of I Planner, Planning Division; Project Applicant <br />group visits, which thc Center sclmiules in a managed ~anct~ation any permits <br />basis. Group anival/dcpanu~s in busns shall be programmed to <br />avoid on-si~ circulation problems. <br />NOISE <br />1. Thc applicant shall comply with thc requirements of the City's Prior to issuance of grading permit (ontc Field inspection, COmplaints from nearby Environmental Coordinator, Planning Division; <br />noise ordinance and refrain from cOnducting extoior conslmction on grading plans); during grading and reaidants Inspection Services Ivlanager, Building Division <br />activity between thc hon~ of 8:00 p.m. and 7:00 a.m. on weekdays construction activities <br />and Saturdays or any time on Sunday or Fedcmi Holidays. <br />2. All cquipmcot shall have round-control davic~s no less effective Prior to issuance of grading permit (no~c Grading plan cbeck, written verification Inspection Servican Manager, Building Division; Project <br />than thnsc provided on thc original cquipmcut. No equipment shall on grading plans), during cons~ucrion provided by thc project applicant, field ConUac~$r <br />have an unmufficd exhaust, inspections <br />3. As directed by the City, the contractor shall implement Prior to issuance of building permit, Building plan check; field inspection Envimnmcntal Coordinator, Case Planner, Planning <br />appropriate additional onisc mitigation measures including, but not during COns*auction Division; Inspection Serviccs Manager, Building <br />limited to, changing thc location of stationary construction Division; Project Contractor <br />equipment, shutting off idling equipment, ruscbeduling <br />construction activity, notifying adjacent rnsldants in advance of <br />cousw~ction work, or installing acoustic barrlcrs around stationary <br />consffuction noise sourcgs. <br /> <br /> <br />